|
County of Hawai'i
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> a.TOTAL b.WITH CURRENT FIRM
<br /> Peer Amble Environmental Planner 33 23
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Stantec GS Inc. (Santa Barbara, CA)
<br /> Stantec GS Inc.is owned and operated by Stantec Consulting Services Inc. through an internal affiliated operations plan.
<br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE
<br /> BA, Physical Geography N/A
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Memberships: Louisiana Archaeological Society, Society for American Archaeology, Society for Hawaiian Archaeology,
<br /> Society for Historical Archaeology
<br /> Awards: Northern Marianas Humanities Council Lifetime Achievement Award, 2019, Saipan
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> NAVFAC Pacific, EIS for Pearl Harbor Naval Shipyard and PROFESSIONAL CONSTRUCTION(If applicable)
<br /> Intermediate Maintenance Facility Dry Dock and Waterfront SERVICES N/A
<br /> Production Facility at JBPHH (Oahu, HI) 2023
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a Scope: Worked closely with Project Manager to "plan the work" by instituting streamlining and process
<br /> improvements into the DOPAA development (i.e., clarity, presentation and simplification of details necessary for the
<br /> impact analysis), development of impact analysis framework and EIS "mock up" for the 16 resource areas, and
<br /> integration of ongoing/previous NEPA documents. Provided direct guidance to SMEs and resource authors to
<br /> establish analytical approach, particularly for critical issues such as schedule development and management
<br /> including design integration, parallel timelines for agency consultations, and public involvement. •Size: N/A• Cost:
<br /> $7.2M • Role: Senior NEPA Planner
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> NAVFAC Pacific, EA for the Home Basing of the MQ-9 Unmanned PROFESSIONAL CONSTRUCTION(If applicable)
<br /> Aerial Vehicle Squadron and KC-130J Marine Aerial Refueler SERVICES N/A
<br /> Transport Squadron at Marine Corps Base HI (Kaneohe Bay, 2022
<br /> Oahu, HI)
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Scope: Led team's analysis and agency consultation support for controversial and high-profile project, which
<br /> b. concluded with a Finding of No Significant Impact (FONSI)within one-year schedule. Provided guidance and support
<br /> for consultation with the State of Hawaii Office of Planning and Sustainable Development, Planning Division who
<br /> concurred with the Marine Corps' determination that the action would not result in any reasonably foreseeable direct
<br /> or indirect effects to uses or resources within the Hawaii Coastal Zone. Integrated NHPA Section 106 consultation
<br /> input from Marine Corps, Navy, and consulting parties into analysis, including development and modification of
<br /> robust alternatives. Skillfully adapted to heightened public interest by implementing a full-team effort to
<br /> address/integrate public comments and deliver the EA on schedule. • Size: N/A• Cost: $878K • Role: Project
<br /> Manager/Senior NEPA Planner
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> NAVFAC Pacific, EA for RM14-1420 Repair Lima Wharf and PROFESSIONAL CONSTRUCTION Of applicable)
<br /> RM14-1423 Repair Mike and November Wharves at Naval Base SERVICES N/A
<br /> Guam (Apra Harbor, Guam) 2020
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> c Scope: Provided senior NEPA planning support and oversight for resource analyses. In project initiation phases,
<br /> conveyed issues of agency and stakeholder concern and considerations for analysis of marine resources, other
<br /> natural resources, and human resources. This included the development of the integrated master project schedule,
<br /> DOPAA development (with particular emphasis on the alternatives) and determining the appropriate level of analysis
<br /> for resource areas, and efficiencies of integration of prior NEPA analysis, consultations, and environmental
<br /> compliance actions. Provided senior analysis for coastal consistency documentation. • Size: N/A• Cost: $290K •
<br /> Role: Senior NEPA Planner
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> NAVFAC Southwest, EIS for Revitalization of NAVWAR Facilities PROFESSIONAL CONSTRUCTION(If applicable)
<br /> d' at Naval Base Point Loma Old Town Campus (San Diego, CA) SERVICES N/A
<br /> STANDARD FORM 330 (REV. 7/2021) PAGE
<br />
|