Laserfiche WebLink
County of Hawai'i <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> a.TOTAL b.WITH CURRENT FIRM <br /> Boyd Dixon, PhD, RPA Archaeologist 54 14 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Stantec GS Inc. (Honolulu, HI) <br /> Stantec GS Inc.is owned and operated by Stantec Consulting Services Inc. through an internal affiliated operations plan. <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> PhD, Anthropology Registered Professional Archaeologist, Founding Member <br /> MA, Anthropology #4772 <br /> BA, Anthropology <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Memberships: Louisiana Archaeological Society, Society for American Archaeology, Society for Hawaiian Archaeology, <br /> Society for Historical Archaeology <br /> Awards: Northern Marianas Humanities Council Lifetime Achievement Award, 2019, Saipan <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> NAVFAC Pacific, Alternative Energy Planning Studies and PROFESSIONAL CONSTRUCTION(If applicable) <br /> Resiliency Roadmap, Pacific Missile Range Facility (Kauai, HI) SERVICES N/A <br /> 2021 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. <br /> Scope: Performed quality control review on three technical reports for different alternatives. Survey areas included <br /> over 2,134 acres on the Mana Plain along Kauai's western shore. Provided guidance for crafting an impact analysis <br /> for pre-planning cultural resources evaluation. Documents supported Archaeological Inventory Surveys within the <br /> potential project sites for the proposed North Grid Connection and Undergrounding Project, and Solar PV and <br /> Battery Storage projects identified in the PMRF Roadmap. • Size: N/A •Cost: $2.1 M • Role: Archaeologist/Principal <br /> Investigator <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Archaeological Subsurface Survey at South Finegayan, Naval PROFESSIONAL CONSTRUCTION(If applicable) <br /> Base Guam SERVICES N/A <br /> 2018 <br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Scope: Directed archaeological data recovery and prepared subsequent report for Latte site 66-08-0141. Led team <br /> for excavations which included backhoe trenching for geoarchaeological studies. Participated in shovel test pits for <br /> excavation archaeological sites within the potential direct impact areas for subsurface deposits. Conducted test units <br /> of Ground Penetrating Radar anomalies previously detected were captured. • Size: N/A •Cost: $265K • Role: <br /> Archaeologist/Principal Investigator <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Archaeological Data Recovery (Andersen Air Force Base, Guam) PROFESSIONAL CONSTRUCTION(If applicable) <br /> SERVICES N/A <br /> 2017 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> c. Scope: Directed archaeological data recovery investigations at 14 prehistoric sites and the NW Field WWII air base and post <br /> war camp. Manually excavated using 0.5 by 0.5 meter(1.6 by 1.6 foot)and 1 by 1 meter(3.3 by 3.3 foot)excavation units. <br /> Manual excavations revealed the remains of prehistoric oven cooking features and activity areas, plus WWII and post war <br /> artifacts and archival documents. Prepared subsequent report to provide mitigation actions for adverse effects to known <br /> cultural resources,which are within the direct impact area for a portion of the range complex located within AAFB. •Size: 14 <br /> sites •Cost: $896K•Role:Archaeologist/Principal Investigator <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> STANDARD FORM 330 (REV. 7/2021) PAGE <br />