My WebLink
|
Help
|
About
|
Sign Out
Home
2004-10-22 TSPECTRASITE
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2004
>
2004-10-22 TSPECTRASITE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 11:14:29 AM
Creation date
6/14/2011 11:14:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GRAHAM:Prior to making a motion, could I just make a commentary for the <br />Commissioners consideration, or shall I wait for a motion for that? <br />GALDONES:Why dont we do the motion then well open it for discussion? <br />GRAHAM:Fine. <br />GALDONES:Commissioner Fujikawa? <br />FUJIKAWA:So I make a motion to approve the application on this contested case, SPP <br />03-018. <br />SMITH:Second. <br />GALDONES:IthasbeenmovedbyCommissionerFujikawaandsecondedby <br />Commissioner Smith, Spectrasite Communications, Inc. (SPP 03-018), the request to allow the <br />retention of an existing 200-foot telecommunications tower and antenna, communications <br />equipment building, four satellite dishes, generator and fuel tanks, chained link security fence, <br />driveway access and related improvements on a 11,413 square foot area be approved by the <br />Planning Commission, along with the Background Report, Finding of Facts and the <br />Recommendations. Further discussions, Commissioners? Commissioner Graham? <br />GRAHAM:I just wanted to bring it to the open and try to cut to the chase. It seems <br />like when we look at the Special Permit requirements, that the one that affects the Intervenors <br />concerns in this case is one whereby when we grant a Special Permit. And I quote from the <br />Recommendation, The desired use shall not adversely affect the surrounding properties. And <br />the Intervenor folks are surrounding property owners and they are saying, you know, it hinders <br />their ability to sell the property, presumably, largely for visual reasons. So it seems like its up <br />to us to decide if that is a substantial enough adverse effect that the request should not be <br />approved. <br />My particular feeling is that because its in an agricultural district, you wouldnt have quite the <br />same expectations that you might have if it was being built right next to a residential district. <br />And, also, that maybe the ability to find a more suitable location with less impact is also whether <br />it even exists, but also it is constrained by the fact that tower is already in place. So I just want to <br />be sure to acknowledge that it does feel like the adverse effect on surrounding properties is the <br />key issue; and my judgment is that the adverse effect is not unreasonable nor meets the bar that <br />would be such as to deny the application. But Im certainly willing to hear from others. Thank <br />you. <br />GALDONES:Thank you, Commissioner Graham. Commissioner Siracusa? <br />SIRACUSA:Just to play Devils Advocate for a minute, on the other hand there are a <br />lot of areas in, on the Big Island and in Puna specifically where people do not have access to <br />communication. They cannot even, where I live, for example, we cant even call 911 cause <br />were in a hollow. And, so, theres a, although I basically am against telecommunication towers <br />as being really ugly and obtrusive, I do realize that theres a public safety issue; and I think that <br />would probably override the concerns of the neighboring property owners. <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.