Laserfiche WebLink
1) The applicant(s), its successor(s), or assign(s) ("Applicant") shall be responsible for <br /> complying with all stated conditions of approval. <br /> 2) The Applicant shall secure all necessary approvals and permits from other affected Federal, <br /> State, and County agencies as necessary to comply with all applicable laws and regulation. <br /> 3) Construction of the new single-family residence and related improvements shall be <br /> conducted in a manner that is substantially representative of plans and details as contained <br /> within the SMA Permit application dated August 29, 2023, and representations made to <br /> the Windward Planning Commission. <br /> 4) Construction of the proposed development shall be completed within five (5) years from <br /> the effective date of this permit. <br /> 5) Artificial light from exterior lighting fixtures, including, but not necessarily limited to <br /> floodlights, up-lights or spotlights used for decorative or aesthetic purposes shall be <br /> prohibited if the light directly illuminates, or is directed to project across property <br /> boundaries toward, the shoreline and ocean waters, except as may otherwise be permitted <br /> pursuant to Section 205A-71(b), Hawaii Revised Statutes. <br /> 6) All construction and maintenance activities shall comply with Chapter 27, Flood Control <br /> of the Hawaii County Code. <br /> 7) All earthwork and grading shall conform to Chapter 10,Erosion and Sedimentation Control <br /> of the Hawaii County Code. <br /> 8) All development generated runoff shall be disposed of on-site and shall not be directed <br /> toward any adjacent properties. <br /> 9) The method of sewage disposal shall meet with the requirements of the Department of <br /> Health. <br /> 10) The Applicant shall ensure that excessive siltation and turbidity of stream and ocean waters <br /> are contained or otherwise minimized through the use of silt containment devices or <br /> barriers, or other approved Best Management Practices as approved by the Planning <br /> Director. <br /> 11) During construction,measures shall be taken to minimize the potential of both fugitive dust <br /> and runoff sedimentation. Such measures shall be in compliance with construction industry <br /> standards and practices utilized during construction projects of the State of Hawaii. <br /> -8- <br />