8. Within 120 days of the permanent abandonment of the tower, the Applicant shall <br />remove the tower and its antenna and accessory structures (including the <br />equipment building and the fence), down to, but not including the concrete <br />foundation. The Applicant shall immediately provide written notification to the <br />Planning Director of the termination of the telecommunication tower and related <br />improvements and the removal of all structures. <br />9. An initial extension of time for the performance of conditions of the permit may <br />be granted by the Planning Director upon the following circumstances: <br />A. Non-performance is the result of conditions that could not have been <br />foreseen or are beyond the control of the Applicant and that are not the <br />result of their fault or negligence. <br />B. Granting of the time extension would not be contrary to the General Plan <br />or the Zoning Code. <br />C. Granting of the extension would not be contrary to the original reasons for <br />the granting of the permit. <br />D. The time extension granted shall be for a period not to exceed the period <br />originally granted for performance (i.e., a condition to be performed <br />within one year may be extended for up to one additional year). <br />10. Should any of the conditions not be met or substantially complied with in a timely <br />fashion, the Director may initiate procedures to revoke this permit. <br />-10- <br />