Laserfiche WebLink
1. Surrounding Property Owners list is incomplete. It's missing several property owners as compared to the Real <br /> Property Tax Office generated list(see attached RPT list). <br /> 2. Permit Area:The application states the size of the requested use as 2,244 SF. However,this only includes the <br /> equipment area,and does not include the access road. Please revise the request to state the total area to be <br /> used for the proposed use. <br /> 3. Remaining land area: Provide a statement on how the remaining land area will be used in accordance with the <br /> agricultural Loning,as this perrnit is Far a portion of the property. <br /> 4. Items#5 and 6 of the Telecommunication Tower Attachment are regarding compliance with FCC regulations on <br /> RF emissions and potential for interference with County public safety radio system.Since Renegade is a tower <br /> infrastructure company,the applicant states that they don't need to show corpliance, but future tenants will <br /> need to comply. While there is a statement for item#6 regarding the need for future tenants to comply,there is <br /> no such statement for item #5. Please provide this with the revised document. <br /> 5. Item#7 of the Telecommunication Tower Attachment states"If you are an infrastructure company, a <br /> commitment from a minimum of two service providers shall be identified in the application."There is no <br /> mention of a commitment from any other company other than AT&T,which is contrary to this requirement. <br /> Please provide a statement of commitment from another service provider aside from AT&T,or provide an <br /> explanation why a second service carrier cannot make a commitment. <br /> 6. Site Plan states the monopole is 100'tall, contradicting the application which states it's 150'tall. Please revise <br /> the Site Plan to be consistent with the application. <br /> 7. Elevations show antenna equipment dedicated to T-Mobile, in addition to AT&T.There was no mention of T- <br /> Mobile within the application narrative. Please explain if T-Mobile is planned to be a second service provider, <br /> and if so, provide verification of commitment. <br /> 8. Structural E ngineer's Letter:The document references the design of a 100' tower and refers to an incorrect <br /> building code. Please revise for consistency and accuracy. Refer to this link for information regarding current <br /> code: https:l/www.dpw.hawaiicounty.gov/divisions/building/building-code-amendments-informationlbuilding- <br /> code-changes-effective-septem ber-1-2021 <br /> Let me know if you have any questions or concerns. <br /> Thanks, <br /> Jessica <br /> Jessica Andrews, Planner <br /> County of Hawai'i Planning Department <br /> 161 Pauahi Street, Suite 3 <br /> Hilo, Hawai'i 96720 <br /> (808) 961-8155 <br /> jessica.and rews!R hawai icou nty_gov <br /> 2 <br />