Laserfiche WebLink
Thank you for your consideration of these suggestions; and IÓll be pleased to answer any <br />questions you may have. Thank you. <br />SPRINGER:Commissioners? I have a question. Perhaps the Director, regarding the <br />vehicle counts and tonnage thatÓs added to the highway that the testifier made reference to, do <br />you have any comments on that, Mr. Yuen? <br />YUEN:ItÓs definitely a problem. The widening from Henry Street, Queen <br />Kaahumanu from Henry Street to Kealakehe Parkway is currently funded and should happen. <br />The widening to Keahole Airport is also a high priority and very likely to happen. Other than <br />that, I donÓt have any more, you do have a traffic report in the application. <br />SPRINGER:Thank you, Mr. Yuen. Members, any questions or comments for the <br />testifiers? Hearing none, thank you both for your participation this evening. <br />Mr. Fuke, do you have any follow-up? <br />FUKE:Sure. Specifically in relation to the public access question, couple things <br />needs to be pointed out. One is that, you know, although the owner owns both properties, this is <br />not the coastal property that has been under consideration by the Commission. This is adjacent <br />to the highway. <br />But notwithstanding that issue, you will note that if youÓre tracking the Planning DirectorÓs <br />Change of Zone recommendation or mine, my proposed SMA conditions, you will notice that on <br />the DirectorÓs Change of Zone Condition II, or the one that I had recommended which is <br />identical to the DirectorÓs Condition II, Condition No. 30, they deal with the public access issue <br />in terms of allowing for that access and making sure it does not impede the development of the <br />properties to the south or to the north relative to access. <br />On the overall roadway issue, couple points IÓd like to make. One is that, you know, the K-to-K <br />Plan does specifically address this particular parcel. It basically states that in this particular area <br />it would be ideal for like some sort of a commercial industrial area and, as a matter of fact, make <br />the concession it would be more appropriate for like an office retail commercial complex, pretty <br />much along the line of what the Applicant is proposing. <br />But notwithstanding that, I think that the Planning Director has assumed a rather pro-active <br />approach in terms of how you address this regional type of roadway system and that is found like <br />I think in their, the DirectorÓs rezoning recommendation, Condition Y. Actually, you know, his <br />goes from like Condition X, Y, Z. And what I had suggested in here, which are identical to his, <br />would be Conditions 19, 20, 21 and 22. But in Condition Y or Condition 21, essentially what it <br />says is that this developer, and probably like others in that area, will have to work together with <br />the State Department of Transportation and come up with a prorata, you know, and discuss the <br />overall transportation system in this area, and then come up with a prorata scheme. And then <br />this developer would have to pay its own share before you can get Final Subdivision Approval or <br />as it reads, what does it read, basically, before you can actually create an impact to the <br />12 <br /> <br />