My WebLink
|
Help
|
About
|
Sign Out
Home
2008-11-24 TDLNR
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2008
>
2008-11-24 TDLNR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 3:53:16 PM
Creation date
6/14/2011 3:53:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This particular project is Phase 1 of a larger build-out. Inside the background it gives you the <br />full build-out plan; ultimately they wanted to have at least 300 light vessels being able to locate <br />in this area. At this time it’s been toned down to approximately 90. So in full build-out you’ll be <br />looking at approximately 90 stalls for this particular area. The mooring blocks that I mentioned <br />earlier are only temporary; they will be replaced later with finger piers. <br />The Planning Department is recommending approval with conditions for all the applications – <br />the SMA, Use Permit and Shoreline Setback Variance. The applicant did have some concerns <br />regarding several conditions within the background and rec. To address those concerns, the <br />Planning Department has sent out revised, or amended conditions, that’s the yellow amended <br />condition form that you have. They were concerned about the aerobic septic system, which is <br />identified in Condition No., in the yellow it would be the new Condition No. 5, and also the new <br />Condition No. 6 having to do with a subsurface filtration system for the boat wash down area. <br />These are in response to comments that the Department received from the Division of Aquatics, <br />DLNR. Additionally, there were concerns regarding landscaping. The Planning Director did <br />make some changes to those conditions – Condition No. 3 as well as deleting Condition No. 5. <br />Phase 1 is proposed not to have the landscaping in that particular phase, but in future phases they <br />will address in greater detail the landscaping requirements. Are there any questions? <br />WATANABE: Any questions of -? Jeff, I have a couple of questions. So the new No. 5, <br />though, still requires an aerobic septic system. Is that correct, or -? <br />DARROW: Correct. The new Condition No. 5, the Planning Director feels that that is <br />still a necessity. <br />WATANABE: Okay. So we hang on to that one. That was for the CZM and water <br />quality. I think I caught a couple of typos also in both your Use Permit and the Shoreline <br />Setback Variance, and that would be for Condition 2 in both of those; I believe we are referring <br />to this as SMA Use Permit 08-000030. <br />DARROW: My apology. That should be 28. <br />WATANABE: Yeah, I think 28, yeah? <br />DARROW: Yes, thank you. <br />WATANABE: For both of them I think we put it in as 30. Other than that -. <br />DARROW: We’ll go ahead and fix those. Thank you. <br />WATANABE: Yeah, okay. So if we have no questions of staff, then -. I guess I should <br />swear you in. May I swear all of you in, please? Would you raise your right hand? Do you <br />swear or affirm to tell the truth now before the Planning Commission? <br />APPLICANTS: I do. <br />EXHIBIT E <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.