My WebLink
|
Help
|
About
|
Sign Out
Home
2010-11-24 TDELUZ TRUCKING
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2010
>
2010-11-24 TDELUZ TRUCKING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 3:54:24 PM
Creation date
6/14/2011 3:54:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOUSEL: Okay. I think we’ll start with our staff. Mr. Darrow, would you like to proceed? <br />DARROW: Thank you, Mr. Chairman. Good morning, Mr. Chairman and Members of the <br />Planning Commission. If I can direct your attention to our presentation on the wall. Our next <br />applicant is Edwin Deluz Trucking and Gravel, LLC. They are requesting an amendment to <br />Condition No. 2 of Special Permit No. 70-85, or in the Planning Commission we refer to as Special <br />Permit No. 164. The location of this application is within the South Kohala District. More <br />specifically, we are looking in the Waikoloa area. The actual subject property is identified in a <br />black outline. For reference, this line running in a north-south direction on the right side of the map <br />is the Hawai‘i Belt Road, running in an east-west direction, mauka-makai, is the Waikoloa Road, <br />and this general area here is Waikoloa Village. This particular property is approximately 1,700 <br />acres in size. The permit area for Quarry Site 1 is approximately 63 acres in size. The colors on the <br />map represent the different zoning. This is a little closer view, which shows the different zonings. <br />The particular property is zoned Agricultural 5-acre. Of interest would be the adjoining properties <br />to the north, which are zoned RA 1-acre, as well as Open zoning, and that’s referred to in Condition <br />No. 2. This is the USGS map, which identifies Pu‘u Hinai in the western corner of this particular <br />portion of the property. This is an aerial photo, which shows the particular area that’s been mined <br />on the pu‘u since 1970. This particular application has received its original approval in 1970 from <br />the Land Use Commission, and so this has been a continual operation since 1970. <br />The applicant is requesting an amendment to Condition No. 2 to extend the life of the permit for an <br />additional five years from December 11, 2010 to December 11, 2015 to allow the continued <br />operation at Quarry Site No. 1. Condition No. 2 currently states, “Quarry operations at Site 1 (Pu‘u <br />Hinai Quarry) shall be terminated by December 11, 2010, or prior to final subdivision approval of <br />the increment of adjacent RA zoned lands which abut the quarry boundaries, or prior abandonment, <br />whichever occurs first.” As referenced earlier, the adjoining RA-1 zoned lands are currently, have <br />received a revised tentative subdivision approval; they have not received final subdivision approval <br />as of yet. But there is always the possibility that that could occur in this particular five-year period. <br />This is the South Kohala Community Development Plan for the Waikoloa Village. As you can see <br />on the lower portion of the map, Pu‘u Hinai is referenced on the map. The actual plan does speak <br />specifically to Pu‘u Hinai, and I’ve brought that up here; it’s under Strategy 2.2, which the title is to <br />“Preserve Waikoloa’s Scenic Views, Landscapes, and Pu‘u” – “Waikoloa has as many pu‘u if not <br />more, than its sister town of Waimea, many of which have names that convey traditional stories of <br />this ahupua‘a. The pu‘u named Hinai in the vicinity of Waikoloa and several other pu‘u in the <br />district are being mined. Mining and also the encroachment of development have degraded the <br />condition of several pu‘u in the district. These pu‘u should be protected and preserved in their <br />natural state.” So this is directly from the current Community Development Plan in the area. <br />Also, I’d like to bring to your attention a new condition that we are adding in response to the South <br />Kohala Community Development Plan: “Mining of Pu‘u Hinai shall immediately cease to protect <br />and preserve the pu‘u in compliance with the South Kohala Community Development Plan.” Also, <br />Conditions No. 4 and 5. Condition No. 4 which is a current condition, states that “upon termination <br />of operations or abandonment of any portion of Site 1 (Pu‘u Hinai Quarry), the land shall be graded <br />to blend with the surrounding areas and re-vegetated. Further, the sites shall be left in a non- <br />hazardous condition.” As a result of this new condition stating that the mining shall cease for this <br />particular area of the Quarry Site 1, Condition 4 triggers. And so what we’ve done is implement <br />Condition No. 5 which states that “the applicant shall submit a soils report of the mined area of Pu‘u <br />Hinai by an engineer qualified in the field of soil mechanics and licensed within the State of <br />2 <br />EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.