Laserfiche WebLink
SALAVEA:Yeah. I€m not sure if this is appropriate for this discussion or this <br />questioning time, but this is for Director Yuen. I get a little confused about what the uses <br />of the industrial zoned area in Paradise Park are used or set aside for. It seems like <br />they€re zoned, they€re there. I don€t know about their availability, cost, and stuff. But <br />why do we keep, you know, special permitting these lots when we should be putting them <br />all in that, in my mind, in those zoned areas? Could you help me? <br />YUEN:Yes. Actually there was a misstatement in the previous application <br />that these were zoned. They were designated in the General Plan as industrial and that <br />just happened in February 2005. So they€re potentially available for zoning; however the <br />landowner has not come forward with that. There are infrastructure that has to be put in <br />and we don€t, there€s not a clear timetable for when that would happen. The idea is to <br />have a designated area and have people go there. You know, you have a light industrial <br />area. And rather than have baseyards, warehouses, storage areas, these self-storage areas <br />thatarerightnexttopeople€shouses,youknow,wheretheyareonspecialpermitsand <br />you have one house here, and a warehouse on the next lot, and a house next lot, and a <br />contractor€s baseyard in the next lot, there should be a developed area for this. So that <br />was the idea behind it. But it isn€t available right now. So that€s why we continue to <br />entertain some special permits for this sort of thing. <br />SALAVEA:Okay, that€s very helpful. Thank you. <br />ALAMEDA:Thank you. Commissioner Siracusa? <br />SIRACUSA:Yes. When, back in €98 when Vurich first applied for his original <br />permit, the Paradise Park had just passed its master plan at that point. And, as a matter of <br />fact, the first issue that came up before the Commission after that happened was Vurich€s <br />original application. So that€s about when Paradise Park did its master plan. Prior to that <br />when the subdivision was first developed, the developer which was Watamull at the time <br />had set aside any number of large parcels for specific purposes. Some of them were for <br />recreation, some were for educational purposes, and some where for commercial and <br />industrial. But, let€s see, Malamala Waldorf School is on one of those parcels, so that€s <br />the educational. The Hui Hanalike with their facility, the pavilion and the ballfield and <br />everything is on one of the recreational parcels. There€s another recreational parcel <br />th <br />across the road on 17 which they have been considering for an ethnobotanical garden <br />forever but haven€t done anything with. And so the one across from Vurich is one of the <br />industrial parcels, dating back to that original developer plan. And if I€ve misstated <br />anything, I€m hoping that the Director will correct me. But that€s what I remember from <br />years and years. <br />ALAMEDA:Thank you. Director Yuen? <br />YUEN:That€s fine, yes. <br />ALAMEDA:Okay.Commissioners,otherquestionsfortheapplicant?Okay,at <br />this time I would like to ask Sonny Weiss to come forward, please. You can have a seat <br />7EXHIBIT C <br /> <br />