My WebLink
|
Help
|
About
|
Sign Out
Home
2005-12-02 TOSHIRO
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-12-02 TOSHIRO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 4:04:51 PM
Creation date
6/14/2011 4:04:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
like a spill-over over what happened or whats happening really like on the commercial office <br />building thats under construction right now. <br />I would like to suggest that, if the Commissioners are willing and, you know, in partial deference <br />to what Ms. Black has raised that, you know, like several things One is like, you know, I cant <br />really, we cant really answer the question about the drainage issue, like how the other project <br />got through the drainage system and got their approvals. All I know is like what the law says, <br />like what we must go through, and what the Planning Director is recommending as a condition <br />with respect to what you can or cannot do within the floodway area. <br />Relative to the traffic, it is a major thoroughfare and its something thats, its kind of expected. <br />You do have high volume traffic in a commercial area and the surrounding areas are all <br />commercial. <br />But,lastly,intermsoflikethevisualaspectsand,youknow,ImjusttryingtoputmyselfinMs. <br />Blacks position or one of her neighbors. And I would like to suggest that under that basis that <br />maybe a condition can be imposed where the height limit of any structures on the property would <br />be limited or capped to no more than what is presently allowed, which is 35 feet under the single <br />family residential zone. If the property were zoned to CG then conceivable the structure could <br />go as high as 10 stories, provided that you have the required parking, setback, and all that. But, <br />and so I think that if you have a condition that would say like all structures on the subject <br />property shall not exceed 35 feet in height, then you pretty much as much as possible while <br />youre allowing the use youre still trying to show out of deference to some of the adjoining <br />property owners which, some of the adjoining properties which are residentially used some <br />deference in terms of the kind of scale that a project on the property could be constructed on. <br />Thats pretty much my comment. <br />SALAVEA:Mr. Chairman? <br />WATANABE:Mr. Chairman? <br />ALAMEDA:Okay. Well do Commissioner Salavea and then Commissioner <br />Watanabe. Commissioner Salavea? <br />SALAVEA:Thank you. Mr. Fuke, can you tell me, is it the intent of the applicant to <br />have the two existing buildings, use the two existing buildings as is for an extended period of <br />time or is it their intention to eventually reconstruct a commercial building with a higher use? <br />FUKE:Based on what the applicant has shared with me, you know, her original <br />intent is just to have the existing structures converted and utilized for office space. Whether that <br />remains to be seen like over the next four or five years, it still remains, you know, it still remains <br />to be seen. Because if there is a strong demand maybe for like office uses which on the other <br />hand considering whats happening on the adjoining property may take a while -. But lets <br />assume that there is a demand for office use, then I can conceivably see a situation where the two <br />structures would be demolished and a new structure would be constructed on the property, <br />subject to making the changes to the floodway designation. But I dont see that happening, you <br />know, in light of whats under construction right now, that to happen like within the next four or <br />16EXHIBIT A <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.