Laserfiche WebLink
Finally, and certainly not least, is that Huallai Road currently is the school bus route for <br />school children from preschool through high school, and one of the stopping places is at that <br />very intersection where this driveway intersects Huallai Road, just 150 feet below a blind <br />bnqmdq-Vdcnm&ssghmjsg`slr`fnncok`bdsng`ve to have school children congregate to catch <br />their bus. Now we aren't going to ask you to change the bus route, but we can improve the <br />blind corner situations so that perhaps we don't have another hazard awaiting us that will -, <br />something that we will all regret. <br />So in conclusion, there's really three things that we are vitally concerned about. One is the <br />intersection itself, the new intersection coming up through Huallai Heights and utilizing, <br />being utilized by this project. <br />Number two, the paved easement that goes through, called a driveway. We think on the copy <br />of the proposed subdivision that I have received, that driveway serves only one lot, Lot No. 5. <br />And I would ask that that roadway or that driveway be stopped at that point and the rest of the <br />lots be accessed from the main road that is adjacent to Huallai Heights, as outlined on this <br />proposed subdivision. <br />And finally, the proposed park we hope will be an asset to our community rather than a <br />liability that those of us who live in the neighborhood will have to endure. <br />I want to thank you for the opportunity to present these concerns, and we look forward to <br />suitable solutions to all of these issues. <br />GALDONES:Thank you, Mr. Error. Commissioners, any questions of Mr. Error? <br />Thank you, gentlemen. Mr. Lim. <br />LIM:Thank you, Mr. Chairman. If I may, I'll try to approach the diagrams <br />as easier, and for purposes of your reference, Exhibits B and C to our application, those are <br />copies of tax maps, and you'll see some of the roads I'm talking about. <br />The roadway system in this area for the projects that were mentioned by the gentlemen, <br />Pualani Estates, Huallai Heights, and the subject property, are -, have been planned I guess <br />since approximately the early '90s. We've been working, had the opportunity to work on <br />Pualani Estates, we're working on Huallai Heights, and also this one. And in the early '90s, <br />in the first rezonings for the Pualani Estates project, it was established that there would be a <br />60-foot wide collector road that would be dedicated to the County, built by the developer, that <br />would come from Queen K Highway in the mauka direction, swing across through the Huallai <br />Heights project, and end up at Huallai Road in approximately this area. So that will be, in <br />essence, for want of a better analogy, the new, the northern Lako Street mauka-makai <br />connector. So that has been in the County's plans for at least 10 years now. <br />The rezoning ordinances for the Pualani Estates Subdivision, the Huallai Heights Subdivision, <br />and as proposed in this particular project, will require the construction of this collector road to <br />11 <br /> <br />