Laserfiche WebLink
GALDONES:Norman. <br />HAYASHI:We do want to make one addition to the proposed conditio <br />that would be both for the change of zone and the SMA Use Permit <br />regard to a hook up to the County sewer system; and, if I may, just read the proposed <br />condition. For the SMA this would be new Condition 7, and all others would be <br />renumbered accordingly. And the condition would state that, ÐThe proposed subdivision <br />shall connect to the County sewer system.Ñ And for change of zone application, this <br />would be a new Condition K, and all the remaining conditions would be realphabetized <br />accordingly. And, again, this would be the same condition; and it would read, ÐThe <br />proposed subdivision shall connect to the County sewer system.Ñ <br />GALDONES:Norman, in reference to the proposed amendments to Cond <br />D, H and V, does the Department have any comments to those? <br />HAYASHI:I havenÓt had the chance to really look, review those conditions so, <br />unless the Director had an opportunity to do so. <br />YUEN:No problem with the 30-foot gate. I think we can put the <br />clarification on the record. I think it is written in a way that it only refers to if the <br />subdivision is gated. If, I donÓt, I can put that on the record. I donÓt think itÓs necessary <br />to change the wording. This is so that if they put in a gate, that the cars stopping at the <br />gate donÓt stick out into the traffic and cause a problem. And, also, that thereÓs a place <br />for people to turn around if they mistakenly find themselves facing, turning off the <br />highway and facing a gate. <br />V, the amendment to V relating to that credit can be given for donations of the right-of- <br />way, I have no problem with that. I would ask Ki about time frame, in the course of he <br />time frame for determining whether additional right-of-way is needed for Alii Parkway; <br />and can we give a time frame. <br />GALDONES:Mr. Emler? <br />EMLER:I believe the applicant asked for three months. I would probably <br />rather go six; but I know that weÓve already, weÓve received the final map on the <br />additional right-of-way we need already from the consultant of Alii Highway. So I donÓt <br />think itÓs a problem. I just wanted a little more leeway. <br />FUKE:Part of the thing, too, is like you know, the applicant, you know, <br />would be three months from the time that the zone change is approved. And if it goes <br />through the normal course of thing, I think the zone change would probably, you know, <br />you would have like about two more months from now. So defacto you would have like <br />about five months. <br />11 <br /> <br />