My WebLink
|
Help
|
About
|
Sign Out
Home
2003-12-04 TSCDKahakai
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2003
>
2003-12-04 TSCDKahakai
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 4:08:08 PM
Creation date
6/14/2011 4:08:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
YUEN:Is this one of the 98 or is this 99? <br />FUKE:ItÓs 99. As I mentioned earlier like this -. <br />YUEN:Yeah. <br />FUKE:Yeah. <br />YUEN:Uh huh. I think we made a mistake in letting you make this <br />99, then, in the first place. <br />FUKE:Notwithstanding that fact, however, you know, that is already an <br />existing lot of record so -. <br />YUEN:If, I donÓt know. I, youÓre asking me like something that <br />thought through and IÓd like to look at all the records in order to give you an answer to <br />that. If what youÓre saying, though, is correct that this is actually Lot No. 99 as it stands <br />and youÓre trying to go from, then this should have been count -. Because it is part of the <br />area covered in the original SMA, I would not count the road lots and the park lots, or the <br />historic preservation lots, against the 98. But it was supposed to be a 98-residential lot -. <br />Right off the bat I would say the answer is no. You couldnÓt be <br />SMA, number one. And, number two, if you had made it as a residential lot, then it <br />would have been wrong to, it would have been wrong to have allowed this as a residential <br />lot to get to 99 under the existing SMA permit because you got 9 <br />FUKE:Okay, so, that being the case, then, what youÓre saying is, which is <br />what the Applicant is doing, coming in for an amendment to the Special Management <br />Area permit? <br />YUEN:To get to 101, you need an, to get from 98 to 101, you need <br />amend the original permit. <br />FUKE:Or whether itÓs to 98 to, or 99? <br />YUEN:Yes, to get from 98 to 99, also, you need to amend the orig <br />permit. <br />FUKE:Correct. You need to amend, you mean, need to amend the <br />permit? <br />YUEN:Yes. <br />FUKE:Correct. Okay. I think he has answered the question to the best, I <br />guess, like what he mentioned, you know, to his ability right now. So, other than that, I <br />have nothing more to add. <br />5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.