My WebLink
|
Help
|
About
|
Sign Out
Home
2024-01-03 Email Claudia Rohr Testimony PD Report on SMA Minor Permits
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-01-04 Windward
>
Planning Director's Report
>
Additional Info Provided to WPC for Consideration at 1-4-24 hearing
>
2024-01-03 Email Claudia Rohr Testimony PD Report on SMA Minor Permits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 1:35:06 PM
Creation date
1/4/2024 1:35:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The SMA use permit assessment application did not qualify for processing <br /> as a SMA minor permit under the definition of"SMA minor permit" in HRS <br /> §205A-22 Definitions and the criteria for assessing potential effects and <br /> significance of each specific circumstance of the use, activity or operation, according <br /> to the criteria of significant adverse effect established by Planning Commission <br /> Rules of Practice and Procedure ("PC Rules"), Rule 9-10(c) and (h) Criteria of <br /> Significant Adverse Effect: <br /> "Special management area minor permit" means an action by <br /> the authority authorizing development the valuation of which is <br /> not in excess of$500,000 and which has no substantial <br /> adverse environmental or ecological effect, taking into <br /> account potential cumulative effects. (emphasis added in <br /> bold) <br /> PC Rule 9-10 Assessment: <br /> (c) The Director shall assess the proposed use, activity or operation <br /> upon the applicant' s compliance with Section 9-1013 (sic) based on the <br /> following criteria: <br /> (1) The valuation of the proposed use, activity or operation. <br /> (2) The potential effects and significance of each specific <br /> circumstance of the use, activity or operation, according to the <br /> criteria of significant adverse effect established by Section 9-101-1 <br /> (sic). <br /> (h) Criteria of Significant Adverse Effect <br /> In considering the significance of potential environmental <br /> effects, the Director shall consider the sum of those effects <br /> that adversely affect the quality of the environment and <br /> shall evaluate the overall and cumulative effects of the <br /> action. <br /> A 'significant adverse effect' is determined by the specific <br /> circumstances of the proposed use, activity or operation. In <br /> determining whether a proposal may have a significant adverse <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.