Laserfiche WebLink
Page 2 Request to waive certified shoreline survey... <br /> 3. Except for the ili'ili pebble beach boundary with the ocean and Kapue River, Proposed Lot 2 has a <br /> majority of its southern boundary being the centerline of the Kapue River. The river is not <br /> considered "shoreline" or ocean. <br /> 4. A portion of the property being part of Lot 1 is fixed by a man-made seawall. <br /> jv <br /> Y <br /> y' A +/ <br /> � � Y f Lot 1,7.236 ac.,Primary residence, <br /> g, I*J& crushing plant foundation and seawall <br /> m Lot 2, 3.111 ac 1 sl:k <br /> .x <br /> �"VY . <br /> ri <br /> 4 ` <br /> r <br /> s <br /> tY f� <br /> ;•i <br /> See Subdivision and Site Plan, Exhibit A for more detailed description of Lot boundaries. <br />