My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND REPORT (PL-SMA-2023-000038)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-01-18 Leeward - CANCELED Due to Lack of Quorum
>
#3 Kona Hawaii Development, LLC (PL-SMA-2023-000038)
>
PD BACKGROUND REPORT (PL-SMA-2023-000038)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 1:00:25 PM
Creation date
1/4/2024 3:01:33 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
11/23/2023
Permit Number
PL-SMA-2023-000038
Parcel Number
750180110000
Description
PD BACKGROUND REPORT (PL-SMA-2023-000038)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construction material that aligns with the character of Kona and the surrounding <br /> development. <br /> 34. Traffic: No traffic impact analysis was conducted for the proposed project, however, the <br /> applicant stated that the proposed development does not generally conflict with the normal <br /> working/commuting traffic. In their comments dated December 18, 2018, the Department <br /> of Public Works (DPW) did not express any traffic related concerns. Given the adequate <br /> sight distance, the existing 25 MPH speed limit of Ali`i Drive, and the planned pedestrian <br /> improvements, the applicant anticipates pedestrian/vehicular conflicts should be <br /> minimized. <br /> PUBLIC SERVICES AND FACILITIES <br /> 35. Access: Access to the underground parking garage will be via Kahakai Road, there will be <br /> no vehicular access to the site from Alii Drive. As proposed, there will be 143 parking <br /> stalls in the underground parking area for residents. Three loading zones, (2 along Alii <br /> Drive and 1 on Kahakai Road) will also be constructed. Lastly, improvements to the <br /> pedestrian sidewalks around the subject property will improve pedestrian access in this <br /> area. <br /> 36. Water: The prior owner has already installed a 12-inch waterline from Walua Road to the <br /> subject property that has since been dedicated to the Department of Water Supply (DWS) <br /> and is sufficient to accommodate a fire-domestic meter. The water commitment fees and <br /> facilities fee have also all been paid. As a result of these improvements and payments, the <br /> site is entitled to 22,000 gallons of water per day (gpd). An estimated daily average water <br /> consumption calculation was determined based on an analysis of the proposed project; the <br /> project consumption was determined to be 21,022 gpd, which is less than the entitlement. <br /> 37. Wastewater: The applicant intends to discharge the project site's wastewater to the <br /> existing sewer line located along Ali'i Drive. <br /> 38. Solid Waste: Solid waste generated on the property will be disposed off-site in <br /> conformance with the Department of Environmental Management Solid Waste Division. <br /> 39. Other Essential Utilities and Services: Electricity and telephone are provided to the site <br /> via existing connections. <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.