Laserfiche WebLink
LIM:-my last comment on this issue is that you know I havent done a lot of the <br />rezonings for, recent rezonings for projects along the Parkway alignment but that runs from <br />Keauhou all the way up to this project and up to Queen K. And Im, at least Im not aware of <br />any similar conditions that require the project developers to, to pay for the cost of sound <br />abatement measures that would be required to qualify the Parkway for Federal construction <br />funds. I mean I, I know that there are numerous projects even just across the street that these, <br />that the parkway, runway, parkway, right-of-way runs through and none of those people are <br />being asked to pay for that. So, you know with respect to the overall attempt by us to provide <br />affordable housing Id ask that this portion of the condition be deleted. <br />ALAMEDA:Mr. Emler or Mr. Yuen response? <br />YUEN:As far as other rezonings, most of the ones that Im aware of along the <br />Parkway are mid to late 80s and I dont know that they paid as much attention to this issue of <br />sound.Im,asabottomlineonourrecommendationIamdefinitelyagainsteliminating,Imfor <br />keeping the requirement that the apartment owners bear the responsibility of any necessary <br />soundproofing as a condition of allowing this project to move forward before the construction of <br />the Parkway. If you look at the rec-, as far as what is likely to happen, if you look at the <br />recommendation theres as much as we really can say about this at the present time. The <br />analysis based on the 1996 EIS makes it, it looks like nothing significant would have to be done. <br />If anything the current, if the Parkway were built according to the current plans it should be, the <br />sound level should be not even as bad as, as indicated in the 1996 EIS. Being that this is still <br />something that is going to take place much in the future, its difficult to, to be, to make any <br />absolute statement about this. They do have, this is partially a function of distance from the <br />Parkway itself. They do have 4 buildings under their site plan that are really quite close to a <br />right-of-way. The remaining buildings are not, are not that close. And distance will reduce the <br />impact. But I do, you know Im sticking by the condition. I think that a rewrite as I did is in <br />order to make it clear that any soundproofing is related to protecting the project. <br />ALAMEDA:Fellow Commissioners we also have a opportunity to comment on the <br />Directors condition. We can disagree or agree. We also are, you know we can also have <br />opinion so feel free to come forward. Mr. Emler any thoughts or final comments? <br />EMLER:Pau. Thank you. <br />ALAMEDA:All pau. Mr. Lim, yourself as well as your applicants can also speak if <br />they need to. <br />LIM:We ask to defer after the public witnesses. I know theyve been waiting <br />all morning so Id like to get them on. <br />ALAMEDA:Also please, please note that I just checking on the protocol again making <br />sure that were following protocol. So after, if we allow public testimony then Mr. Torigoe and <br />then the applicants will come back. Can they again continue to present their case if you will? Or <br />should we do it right now and let them get it all on the table? <br />EXHIBIT B <br />29 <br /> <br />