My WebLink
|
Help
|
About
|
Sign Out
Home
2005-12-08 TLava Kuakini
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-12-08 TLava Kuakini
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 4:17:31 PM
Creation date
6/14/2011 4:17:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
YUEN:Well, yes. Its, and the credits apply not only to rezone property but they <br />can be used off site within a 15 mile radius. So, but the reason that this wording is in there is to <br />make it clear that they can earn credits if they produce housing in excess of their basic <br />requirement. <br />GRAHAM:And is that offer extended to all applicants for rezoning? <br />YUEN:Yes. If the basic you know we, this, in-. In February 2005 the Council <br />passed a changes to chapter 11, which I had worked on and the County Housing Administrator <br />had workedon and what, and these applied partially-. These applied to some extent <br />retrospectively to people that had an affordable housing condition on rezonings but had not <br />developed yet and so had not satisfied the affordable housing condition. And they, our intent <br />was also to apply them in a standard way prospectively to rezonings that come in. And this is <br />the, the base requirement so that you dont end up with constant negotiations on a project by <br />project basis. So, and the way that it worked it was important to change this going backwards <br />because the policy at that time had a inloofy loophole that was very generous. Then to explain <br />thereasonforthis,forthecreditsituationisthatwere,youknowweretryingtoencourage <br />people to develop affordable housing. And it may be, it may be more practical to do it on one <br />particular site and to do a project thats largely affordable housing on one site. At the same <br />token you may have developers who simply dont, who have an affordable housing requirement <br />but dont want to do it on their site either for the standpoint of mixing the type of units that <br />theyre producing or the market theyre trying to produce. Or maybe they have an area thats <br />very expensive to make units in the first place. So, then you have, we create this opportunity for <br />a private trading mechanism where the, say the high cost market developer who has an <br />affordable housing requirement can get together with a person who wants to create affordable <br />housing and subsidize-, theyll in effect subsidize the affordable housing by buying credits that <br />are generated by the affordable housing developer whose creating more than they need. And we <br />do have, including this applicant; we do have a number of applicants that are interested in doing <br />that kind of, doing the affordable housing part of that project in order to-. And, generating, and <br />as a sweetener to their own projects, which often times need some financial help to be viable <br />theyre interested in having these credits. So, what we wanted to make sure though was if <br />somebody comes in up front and says that theyre going to do more than, than theyre <br />requirement on site that were, that were not, and we put that in as a condition of the affordable <br />housing ordinance. That they still get the same number of credits, as they would have if they just <br />had an ordinary requirement. Now, in the case that, the example that I just that we started off <br />with of they make only 50%, 50% affordable and its all at the top level at 140 percent of median <br />level then theyre not going to earn that many credits. Theyre only doing. Theyre earning. <br />Say its a hundred; just use a hundred to make it simpler okay. They made a-; they made 50 <br />units at the top end of affordable. Theyre only earning 25 credits for that. They gotta earn 20 <br />credits for their project so they only got 5 extra credits. <br />ALAMEDA:Very good. Commissioner Graham? <br />GRAHAM:Maybe I can keep addressing the Planning Director if its easier, whatever <br />you think. As far as how this implements in time, the affordable housing. Lets say the <br />affordable housing is $250,000 homes in a project where the non-affordable part is lets say <br />EXHIBIT B <br />5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.