Laserfiche WebLink
intersection shall meet with the approval of the Departments of Transportation- <br /> Highways Division and Public Works; <br /> ■ Condition K(Administrative time extension): an initial extension of time for <br /> the performance of conditions within the ordinance may be granted by the <br /> Planning Director upon the following circumstances:... <br /> Alternatively, if the deletion of Conditions B and C is not possible, the applicant is <br /> requesting time extensions with specific amendment language as follows (material to be <br /> deleted is bracketed and struck-through; new material is underlined): <br /> (B) final Plan Approval of the development shall be secured from the Planning <br /> Department within ten years from the effective date of this [mot] <br /> amended ordinance. To assure adequate time for plan approval review and in <br /> accordance with Chapter 25-2-72 (Zoning Code),plans shall be submitted a <br /> minimum offorty-five days prior to the date by which plan approval must be <br /> secured. Plans shall indicate internal driveway circulation with the adjacent <br /> Kona Coast Shopping Center; <br /> and <br /> (C) construction shall commence within [one] two years from the date of receipt <br /> of Final Plan Approval and be completed within [iwe]five years thereafter; <br /> The applicant's stated reasons for the request are as follows: <br /> Deletion of Conditions B and C: The applicant is requesting deletion of these timed <br /> construction performance conditions B and C to allow the entire parcel to be developed <br /> as the market demands and not with artificial timeframes on a smaller portion of the <br /> property for the following reasons: <br /> 1. The applicant believes that the property and surrounding area has always been <br /> slated for industrial/commercial uses as evidenced by its original MG-la zoning <br /> in 1967 and the remainder of the property's CV-10 zoning since 1971 and that <br /> continuation of the CV-10 zoning would be the most suitable land use <br /> designation. <br /> 2. The applicant has completed all the ordinance required off-site infrastructure <br /> improvements and other off-site infrastructure required for commercial <br /> development is available to the property; <br /> 2 <br />