Laserfiche WebLink
C. ZoninQ <br /> The County zoning of the site is Resort(V-.75). Based on this zoning, the <br /> maximum number of units allowed for this 76,739-square foot site is 102, which <br /> is more than what the Applicant is proposing. The proposed project is 100 units. <br /> In terms of setback, the minimum requirement is 20 feet from the front and rear <br /> property lines, and eight (8) feet for one story and an additional two (2) feet for <br /> each additional story from the side property lines. The structure will be set back <br /> at least 20 feet from Ah'i Drive and the verticals of the structure will have at <br /> least 20 feet from Kahakai Road. As noted earlier, a Variance from the front <br /> yard setback along Kahakai Road will be sought to allow the retention of existing <br /> and County-approved improvements for a retaining wall, subterranean parking, <br /> and foundation. The side yard setback will be at least 14 feet. (See Figure 7) <br /> The maximum allowable height is 45 feet. The proposed structure will consist of <br /> three (3) stories and subterranean parking, and they will not exceed the 45-foot <br /> requirement. (See Figures 11, 12) <br /> One hundred forty three (143)parking stalls are being proposed. As outlined in <br /> the Zoning Code, 114 stalls would be required for the "suites" and three for the <br /> standard guest rooms for a total of 117 stalls for the 100 unit project. The back <br /> of the area office is for the staff, while the retail and guests only continental type <br /> breakfast areas are not intended to be free-standing operating areas but more to <br /> service the guests. As such, the applicant believes those areas are exempt from <br /> the parking requirement. <br /> D. Other Permits <br /> As noted earlier, a setback Variance from the Planning Director will be required <br /> to allow the retention of portions of a rock wall, subterranean parking, and <br /> foundation. The other required permits will be of the ministerial variety. Some <br /> of these include Plan Approval from the Planning Director, Building Permit, <br /> water and sewer hook up, and the like. <br /> VI. ENVIRONMENTAL CONSIDERATIONS <br /> A. Soils <br /> It should be noted that the entire site has been bulldozed in the past and more <br /> recently improved with a subterranean parking garage. Because the site has <br /> already been built up and/or situated within an urban environment, the Land <br /> Study Bureau does not have a soil classification of the site. <br /> Notwithstanding the above, the US Department of Agriculture Soil Survey <br /> Report previously identified the predominate soils overlying the project site as <br /> 8 <br />