My WebLink
|
Help
|
About
|
Sign Out
Home
PD Recommendation Report HICDC (PL-REZ-2023-054)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-02-29 Leeward
>
#5 Hawaii Island Community Development Corporation (PL-REZ-2023-000054 / Amend REZ-2009-000112)
>
PD Recommendation Report HICDC (PL-REZ-2023-054)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 7:21:34 AM
Creation date
2/15/2024 7:21:26 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
1/23/2024
Related Permits
REZ-09-000112
Other Parcel Numbers
550190270000
Permit Number
PL-REZ-2023-000054
Parcel Number
550190250000
Description
PD Recommendation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Access to the rezone area is from the Akoni Pule Highway, a State-owned <br /> highway with an approximate 38-foot pavement and paved shoulders within an 80-foot <br /> right-of-way via Kumakua Road and Ho`oko Road, County-owned roadways consisting <br /> of 32 feet of roadway pavement and concrete curb, gutter, and sidewalk within a 42-foot <br /> right-of-way. According to the applicant, the proposed Phase 3 roadways will be <br /> similarly constructed to these standards, which are permitted under a roadway variance <br /> granted in 2023. The applicant plans to dedicate these roadways to the County like they <br /> did for the for the first two phases. The preceding will be added as a condition of <br /> approval. <br /> The Hawaii Department of Transportation (HDOT) has no objection to the time <br /> extension, however the HDOT Airports Division provided comments addressing <br /> requirements of the Federal Aviation Administration (FAA) since the proposed project is <br /> located approximately 2.46 miles from the boundary of the Upolu Airport. <br /> Thirty-three (33) units of County water are available for the project and the <br /> applicant has secured water commitments until October 31, 2024. A condition of <br /> approval will require the applicant to maintain active water commitments until such time <br /> as the facilities charges are paid and for the applicant to construct required water system <br /> improvements, including but not limited to new, minimum 8-inch water mains capable of <br /> delivering adequate pressure and volume under peak-flow and fire-flow conditions, <br /> service laterals that will accommodate 5/8-inch water meters to each lot, and fire hydrants <br /> prior to issuance of Final Subdivision Approval. <br /> There is no County Sewer in the area, thus individual wastewater systems meeting <br /> with the approval of the State Department of Health will be utilized. <br /> There are no municipal solid waste collection services in the County. Solid waste <br /> will be disposed of at an authorized landfill by commercial haulers or individual <br /> homeowners. A condition of the existing ordinance requires the applicant to submit a <br /> Solid Waste Management Plan to the Department of Environmental Management for <br /> approval prior to receipt of Final Subdivision Approval. <br /> Lastly, existing conditions of approval require the applicant to secure approval of <br /> a drainage study from the Department of Public Works prior to issuance of a construction <br /> permit and that the applicant will be required to construct any recommended drainage <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.