Laserfiche WebLink
Pursuant to Planning Commission (PC) Rule 9-10(b)(5) & (11), and in order for the Planning <br /> Director to accurately evaluate whether the proposed action will have a substantial adverse effect, <br /> pursuant to PC Rule 94(e)(4), the Director shall require that SMA Use Permit Assessment and <br /> Use Permit applications include all of the information necessary to assess the proposed activity's <br /> impacts in the Special Management Area, including but not limited to: An assessment of impacts <br /> on hazard risk, including flooding, tsunami, and coastal erosion and/or sea level rise over the life <br /> of the development(PC Rule 9-10(h)(9)). <br /> Fire: Eight of eighteen fire hydrants are currently inoperable; many have rusted at the base and <br /> several have fallen over. With the annual fires encountered within Punalu`u and the confines of <br /> this SMA, we request that hydrants be repaired before other projects are initiated. From 2006 <br /> DEIS, the project area is located in an area susceptible to brush fires. Brush fires could easily <br /> spread onto the project site without adequate fire buffers on the project perimeter. The County Fire <br /> Department, Colony 1 Condo, and Punalu`u Mauka (Kalana Estates) residents have pushed to <br /> address these issues but in 4 years of black sands beach LLC ownership, these fire hydrants are <br /> still out of order. For first hand information on infrastructure issues please contact Jeff Silva who <br /> is a board member condo owner colony one, grade 4 licensed water distribution system operator, <br /> grade 1 system operator and resident of Punalu`u and works for the Hawaii County Fire <br /> Department in Pahala (808)345-8024. <br /> Flooding: Three of seven bridges were repaired in 2021 between Honu`apo and Pahala Hospital. <br /> The Punalu`u property includes coastal areas in zones AE and VE which represent areas with <br /> potential for coastal flooding. Mauka areas designated in zone X were determined to be outside of <br /> the 500-year floodplain. With the impacts that Rapid`Ohi`a Death is having within our Ka`u Forest <br /> Reserve (directly mauka of the property) and the dying off of our Kupuna trees, we can expect to <br /> see heavier flooding conditions and severe runoff with major debris at levels we have not <br /> encountered before. Four bridges have not been updated with repairs, three of which are located <br /> between Punalu`u and the newly-built emergency shelter in Pahala, we have reason to insist that <br /> repairs to the remaining bridges be completed prior to addressing the potential for any new <br /> development. <br /> Tsunami: The Federal Emergency Management Agency flood insurance rate map indicates areas <br /> of potential tsunami inundation on the coastal areas of the property. Due to its historic exposure to <br /> tsunami hazards, the risk of future tsunami inundation is significant in the coastal zone and must <br /> be addressed. <br /> Lava flows: The project area is within lava hazard zone 3, 3 with one posing the greatest hazard <br /> and 9 posing the least, indicating a moderate to severe hazard. . An active cinder cone sits within <br /> the proposed development area. This cinder cone is the arm of the southwest flank of Mauna Loa, <br /> which means that a future eruption could potentially begin from within this cinder cone. There is <br /> a reason why the adjacent lands to the northeast and southwest are undeveloped. We believe that <br /> any development in this area is subject to inundation by future flows, and without addressing <br /> evacuation routes and wildfire mitigation measures, no new developement should even be <br /> considered. <br />