My WebLink
|
Help
|
About
|
Sign Out
Home
2024-02-27 PL -SMA-2023-000036 Simmy McMichael Opposition Testimony
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-02-29 Leeward
>
#3 Phil Tinguely, Managing Member of Walua Partners, LLC (PL-SMA-2023-000036)
>
Additional Info Provided to Commissioners at 2-29-24 Hearing
>
2024-02-27 PL -SMA-2023-000036 Simmy McMichael Opposition Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2024 10:32:13 AM
Creation date
3/6/2024 10:23:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Kuakini Highway Improvements Project, Phase 2 Draft Environmental Assessment <br /> Widening Kuakini Highway would help address existing and future traffic congestion. Widening <br /> is proposed only as far as the future intersection with proposed Ali`i Highway because with Ali`i <br /> Highway in place, it is projected that the volume of traffic on Kuakini Highway south of Ali`i <br /> Highway would only be half the volume as on Kuakini Highway north of Ali`i Highway. <br /> 1 .2.2 Improve Roadway Drainage <br /> Roadway drainage improvements are needed to address existing drainage conditions. Much of <br /> Kuakini Highway within the project limits does not have drainage facilities. Storm water runoff <br /> from the road sheet flows to the side of the road into unimproved areas, or along gutters to drain <br /> inlets in those areas where gutters do exist. <br /> Flow diversion and control at stream crossings is also needed to protect the roadway during <br /> large storms. Such storms occur regularly in the Kona area and occasional flooding of Kuakini <br /> Highway occurs. However, improvements to stream crossings are not part of this project <br /> because other agencies are currently addressing the concerns associated with stream <br /> crossings. The Keopu Stream drainage way at the northern terminus of the proposed project is <br /> being studied by the U.S. Army Corps of Engineers (USACE). It is anticipated that USACE will <br /> construct improvements upstream so that the box culvert at Kuakini Highway would not require <br /> resizing (personal communication, Derrick Elfalan, Oceanit, Inc., May 5, 2006). Nevertheless, <br /> all culverts will be assessed during final design to verify that culvert sizes are sufficient to <br /> convey predicted runoff at each location. Improvements needed at the Waiaha Stream <br /> drainage way, including its "Splitflow #3" crossing near the southern project terminus, have been <br /> included in the design of the Ali`i Highway project. <br /> 1 .2.3 Implement Common Design Standards — Enhance Pedestrian and Bicycle <br /> Facilities and Visual Character <br /> Another purpose of this project is to apply common design standards along Kuakini Highway. <br /> These design standards are described in Section 1.4. While some stretches of Kuakini Highway <br /> have been previously upgraded by private developers in association with their projects, varying <br /> design standards across the development projects has led to an inconsistent appearance. <br /> Moreover, those segments of roadway without recent development have not been improved. <br /> Therefore, the County proposes to create a more visually cohesive roadway design. <br /> Beyond widening and adding vehicular lanes to the roadway, the County also proposes to <br /> extend the enhancement of pedestrian and bicycle facilities that was begun in Phase 1 between <br /> Palani and Hualalai Roads. Early public input regarding the project (see Chapter 3) confirmed <br /> that pedestrian and bicycle facility improvements are needed in this roadway segment. <br /> Employees and students at the University of Nations represent a significant portion of the need <br /> since many people walk or bike regularly between the campus and the center of Kailua-Kona. <br /> Therefore, connecting the University to Hualalai Road, with its pedestrian and bicycle facilities, <br /> would benefit the University community and residents in the adjacent areas. <br /> Visual improvements such as landscaping and the relocation of overhead utility poles were also <br /> part of the Phase 1 design. Under Phase 2, DPW proposes to extend such improvements to <br /> achieve a consistent look, enhancing the corridor. Where possible, the proposed typical section <br /> for Phase 2 was made similar to Phase 1, including the placement of utility poles only on the <br /> mauka side of the road. See Section 1.4 below for more details on the typical section. <br /> March 2013 Page 1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.