My WebLink
|
Help
|
About
|
Sign Out
Home
2024-02-28 PL-CCH-2023-000019 Jana Cook Additional Testimony
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-02-29 Leeward
>
#4 Kona Hawai'i Development, LLC (PL-SMA-2023-000038)
>
Additional Info Provided to Commissioners at 2-29-24 Hearing
>
2024-02-28 PL-CCH-2023-000019 Jana Cook Additional Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 7:45:38 AM
Creation date
3/8/2024 7:45:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jana Cook <br /> 421 East Broad Street,Suite 4-100 75-5870 Kahakai Road Unit 509 <br /> Mineola,Texas 75775 Kailua-Kona,Hawaii <br /> 951-855-6126 JCook251@att.net <br /> January 18, 2024 <br /> Honorable Members of the Commission, <br /> As a long-time owner at Hale Kona Kai, I appreciate the opportunity to address the Commission <br /> regarding the proposed development at Ali'I Drive and Kahakai Road. <br /> Please note that I am not opposed to the development of the property. The unfinished project <br /> has been a blight on the community for far too long. However, the development must be done <br /> in a manner that is healthy for the entire community, the Kahakai Road neighborhood, and <br /> even for the applicant and any future operator of the proposed business. <br /> I have many concerns about the background report which seems incomplete with the <br /> anticipated negative impacts glossed over or omitted from the report. I urge the Commission <br /> to reject this report, returning it to the applicant to provide complete, detailed elevations and <br /> diagrams of the proposed project. For example, omitted are complete elevations of the west <br /> and north side of the complex which would give a full aspect of how the proposed building will <br /> change the entire atmosphere of the neighborhood. The proposed 40' structure on top of the <br /> existing retaining wall and parking garage will be massive and loom over the narrow Kahakai <br /> Road. <br /> A primary concern is the room construction. The provided diagrams show 100 rooms with Type <br /> A, B, C and D configurations. By my count there are 51 rooms in the Type C configuration which <br /> are two-room suites with three entry doors. Such construction will allow these rooms to be <br /> rented as two separate rooms and have the effect of creating a 151-room hotel. <br /> In the Estimated Future Water Consumption Report completed by Ramon Velazquez, PE, there <br /> are only Type A, B and C units, with Type D omitted. The Type C unit is listed as a maximum of 6 <br /> occupants, but it only calculates for 5 Type C units, not 51. By my calculations, this changes the <br /> maximum total occupancy from 344 guests to 452 guest and places Total Daily Estimated water <br /> usage at 28,874 gallons, not the 21,022 gallons listed in the report. This is approximately 25% <br /> above the water use of 22,000 gallons per day supported by the previously permitted and <br /> installed water connection. <br /> The parking provided on site is only 143 spaces. With spaces reserved for check-in, handicap, <br /> staff and other hotel parking, this is completely inadequate for the estimated occupancy of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.