My WebLink
|
Help
|
About
|
Sign Out
Home
.PD BACKGROUND REPORT (PL-SMA-2024-000047)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-04-04 Windward
>
#4 Jeremy Graham (PL-SMA-2024-000047)
>
.PD BACKGROUND REPORT (PL-SMA-2024-000047)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 12:59:21 PM
Creation date
3/22/2024 12:58:18 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/1/2024
Related Permits
PL-SMA-2024-000047
Permit Number
PL-SMA-2024-000047
Parcel Number
150590490000
Description
PD BACKGROUND REPORT (PL-SMA-2024-000047)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(16'x30')with a surrounding 10' wide concrete deck will be located forty seven feet( 47') from <br /> the approved shoreline. (See attached Plan: site plan, floor plans. elevations.) <br /> Total proposed developed area including accessory areas, driveway, landscaping is <br /> 20,000 square feet. <br /> A well will be permitted and installed to supply water. <br /> Because the area to be developed is gently sloping there may be a need for low retaining <br /> wall (4 feet max height) on the ocean side of the residence. <br /> 10 loads of base course gravel are anticipated. Excavating and compacting activities are <br /> anticipated with approximately 12,000 square feet to be impacted by grading, excavating, fill and <br /> compacting activities for the total project including septic systems and driveways. Up to 4000 cu <br /> yards of material may be brought in. <br /> The Project is set back from the coastline by a minimum of 47 feet to the nearest <br /> development which will be the septic system leach field. This project will not affect beach <br /> processes, artificially fix the shoreline or interfere with public access and views to and along the <br /> shoreline. <br /> Site specific Best Management Practices ("BMPs")will be developed by the contractor in order <br /> to mitigate any potential for project-related impacts to the nearshore marine environment. BMPs <br /> will include the following provisions: <br /> • Excavation and grading activities will all be kept a minimum of 40 feet from the <br /> shoreline. <br /> • The entire project will take place outside the shoreline setback area. <br /> • All heavy equipment, machinery and trucks will be stored on site. <br /> • Drip pans will be stored under vehicles when not in use. In the event of a spill of leak of <br /> fuel, the flow of such fuel will be stopped and all sources of ignition will be removed. <br /> The spill will be contained by placement of a barrier around the area and contaminated <br /> earth will be placed in containers and properly disposed of off-site. <br /> • In case of ponding fuel, a hazardous materials vacuum truck will be used to collect the <br /> fuel. <br /> • A construction, silt and debris barrier meeting with the approval of the Planning Director, <br /> shall be erected prior to the commencement of construction activities and shall remain in <br /> place until final inspection has been granted for all improvements. This barrier will <br /> surround the construction area(shown on attached site plan). <br /> C. DESCRIPTION OF SUBJECT PROPERTY <br /> Property is located on Paradise Ala Kai,Hawaiian Paradise Park <br /> Tax Map Key No.: (3) 1-5-059:049 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.