My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-REZ-2022-000033) (2)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2022
>
2022-12-15 Leeward
>
Item #1 Kona Three, LLC (PL-REZ-2022-000033)
>
PD Background Report (PL-REZ-2022-000033) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 3:26:49 PM
Creation date
4/20/2024 7:31:34 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
11/22/2022
Description
PD Background Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
associated with pre -Contact era through early post -Contact era to Historic era agriculture. <br />Several Historic era walls and enclosures, a lava tube burial, and a portion of the old <br />railroad berm were also documented in the report. Preservation was recommended for the <br />burial and the railroad berm. SCS submitted a DRAFT Burial Treatment Plan for Burial <br />Site #50-10-57-30593 Located in Holualoa Is' Ahupua `a, North Kona District, Island of <br />Hawai `i, TMK: (3) 7-6-021:017, which was accepted by the Hawaii Island Burial <br />Council on August 15, 2019 with a determination to preserve the burial in place. By letter <br />dated August 19, 2019, SHPD accepted the document and SCS finalized the document as <br />a Burial Site Component of a Preservation Plan, which includes interim preservation <br />buffers and archaeological monitoring, and long term preservation measures including a <br />permanent, 20 -foot preservation buffer from the outside perimeter of the burial portion of <br />the lava tube, an additional 10 -foot, no -build easement outside of the pennanent <br />preservation buffer, and the construction of a permanent, low rock wall with a gate for <br />pedestrian access to be built under the direction of and inspected by a qualified <br />archaeologist. (Planning Department Exhibit 2 — August 19, 2019 Letter from SHPD <br />Accepting the August 2019 Burial Treatment Plan and August 2019 Burial Site <br />Component of a Presrvation Plan for Burial Site #50-10-57-30593 Located in the <br />H61ualoa 1st Ahupua`a, North Kona District, Island of Hawaii, Hawaii TMK: <br />(3) 7-6-021:017). <br />A final AIS completed by SCS (Escott and Escott, August 202 1) included a 100% surface <br />survey of the entire 76.121 -acre project site with site recordation, GPS, photography, and <br />subsurface excavation with documentation. A total of 18 sites and one isolated find were <br />identified, including two newly identified sites and a petroglyph, with the remaining sites <br />being previously documented, including pre -Contact to post -Contact enclosures, <br />platforms, mounds, lava tubes, walls, a railroad berm, and complexes. Five previously <br />identified sites were determined no longer present and as stated earlier, two burials were <br />disinterred and reinterred off-site in 1993. All the sites were assessed as significant under <br />HAR §13-284-6 Criterion d. The railroad berm (Site 50-10-37-30592) was also assessed <br />as significant under Criteria a and c and was recommended for preservation. The <br />petroglyph (Site 50-10-37-31254) was also assessed as significant under Criterion e and <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.