My WebLink
|
Help
|
About
|
Sign Out
Home
PD Recommendation Report Black Sand Beach (PL-SMA-2023-046)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-06 Windward Special Meeting
>
PD Recommendation Report Black Sand Beach (PL-SMA-2023-046)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 4:25:45 PM
Creation date
2/27/2024 4:25:36 PM
Metadata
Fields
Template:
Plan Doc Template
Permit Number
PL-SMA-2023-000046
Parcel Number
950190110000
Description
PD Recommendation report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16. The applicant shall include the location of all preserves, sites, preservation buffers or <br /> similar protection strategies on the site plan and all future maps submitted to the County <br /> in conjunction with any application reviews or approval requests. <br /> 17. In the event that surface or subsurface historic resources, including human skeletal <br /> remains, structural remains (e.g., rock walls, terraces, platforms, etc.), cultural deposits, <br /> marine shell concentrations, sand deposits, or sink holes are identified during the <br /> demolition and/or construction work, cease work in the immediate vicinity of the find, <br /> protect the find from additional disturbance and contact the State Historic Preservation <br /> Division at (808) 933-7651. Subsequent work shall proceed upon an archaeological <br /> clearance from DLNR-SHPD when it finds that sufficient mitigation measures have been <br /> taken. <br /> 18. An annual progress report shall be submitted to the Planning Director prior to the <br /> anniversary date of the effective date of this permit. The report shall include, but not be <br /> limited to, the status of the development and to what extent the conditions of approval are <br /> being complied with. This condition shall remain in effect until all of the conditions of <br /> approval have been complied with and the Planning Director acknowledges that further <br /> reports are not required. <br /> 19. An initial extension of time for the performance of conditions within this permit may be <br /> granted by the Planning Director upon the following circumstances: <br /> A. The non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the applicant, successors or assigns, and <br /> that are not the result of their fault or negligence. <br /> B. Granting of the time extension would not be contrary to the General Plan or <br /> Zoning Code. <br /> C. The granting of the time extension would not be contrary to the original <br /> reasons for the granting of this permit. <br /> D. The time extension granted shall be for a period not to exceed the period <br /> originally granted for performance (i.e., a condition to be performed within <br /> one year may be extended for up to one additional year). <br /> E. If the applicant should require an additional extension of time, the Planning <br /> -16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.