My WebLink
|
Help
|
About
|
Sign Out
Home
2024-05-03 Diane Ware SU
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-06 Windward Special Meeting
>
Public Testimonies 2-17-24 thru 5-3-24
>
2024-05-03 Diane Ware SU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 2:41:16 PM
Creation date
5/3/2024 2:41:04 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/3/2024
Description
Support testimony
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,,..,,, A.QUA ENGINEERS <br /> ,6ti LUPLOYEE OWNED C0%i1,,%NN' <br /> Ownership will be processing new entitlements over the next 3 years, and the planned <br /> improvements and repairs being planned will need to be consistent with such entitlements. <br /> Potable Water System Justification <br /> Repair or replace fire hydrants as Replace damaged fire hydrants and repairvalves as <br /> needed. needed. <br /> Replace distribution system Replace broken 12-inch system gate valves <br /> broken gate valves <br /> Wastewater System Justification <br /> Replace wastewater treatment Based on the condition of the existing facility It would be <br /> facility more cost efficient to replace the treatment plant with <br /> newer technology that is eco-friendly and would be built <br /> on a smaller footprint. <br /> 121Page <br /> Exhibit A <br /> Page 12 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.