My WebLink
|
Help
|
About
|
Sign Out
Home
Applicant's Addendem to TIAR 12.12.2022
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2022
>
2022-12-15 Leeward
>
Item #1 Kona Three, LLC (PL-REZ-2022-000033)
>
2022-12-15 LPC Board Packet
>
Applicant's Addendem to TIAR 12.12.2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 8:22:02 AM
Creation date
5/7/2024 8:35:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KTL Kona Villas November 2021 Final TIAR Addendum <br /> E-B EMB" F=m Page <br /> International 12/12/2022 <br /> Innovate I Adapt I Sustain <br /> 3. Final Royal Vistas TIAR (SSFM, November 2021) <br /> o Incorporated changes from the August 3, 2021 comments, submitted, and accepted. <br /> o The following changes to the recommendations from the previous submittal are: <br /> ■ At Hualalai Street(north) should remain unsignalized. This intersection did <br /> not pass traffic signal warrants and single-lane roundabout were shown to <br /> worsen operations. <br /> ■ At Hualalai Street(south) should remain unsignalized. This intersection did <br /> not pass traffic signal warrants and single-lane roundabout were shown to <br /> worsen operations. <br /> ■ At Kuakini Highway a traffic signal and single-lane roundabout would <br /> worsen traffic operations. This intersection is recommended to remain <br /> unsignalized. <br /> o Comments were received from COH DPW Traffic Division and addressed to the <br /> Planning Department in a Review Comment form dated September 28, 2022 <br /> (attached at the end of this document). These are the basis for this addendum. <br /> A. September 28, 2022 Comments from County of Hawaii Traffic Division <br /> Comments dated September 28, 2022 from the COH DPW Traffic Division were received and <br /> subsequent discussions with DPW resulted in an agreement to provide an addendum to the <br /> November 2021 Final TIAR to address the following: <br /> Comment#1: Include the project connection to Lako Street, through Kekauanaoa Place, in Phase <br /> 1 as opposed to the original plans to include in Phase 2. <br /> • This will require a redistribution and analysis of future traffic outbound project related trips <br /> for Phase 1 including the Future (2024), Future (2029), and Future (2039) With Project <br /> conditions. <br /> • Future With Project analysis will need to be updated at Royal Vistas Roadway, Kuakini <br /> Highway, and Lako Street. <br /> Comment #2: Provide further documentation to support the need for State of Hawaii DOT to <br /> widen Route 11 from 2 lanes to 4 lanes, between Henry Street and Kamehameha III Road. <br /> Comment #3: Include a discussion about the existing vehicular bottleneck along Route 11 at the <br /> intersection with Nani Kailua Drive. <br /> Comment#4: Include clarification as to why "no action" (doing nothing)is better than installing <br /> a traffic signal or a roundabout at the unsignalized intersections of concern. <br /> Comment #5: Mitigation for Lako Street, including the widening of Route 11 from 2 lanes to 4 <br /> lanes, dual eastbound left turn lanes, and the possibility of changing the Lako Street approach <br /> phasing if sight distance is adequate. <br /> IL November 2021 Final TIAR Summary <br /> The November 2021 Final TIAR analyzed the Existing (2019) traffic conditions and the Future <br /> (2024, 2029, 2039)traffic impact of the project's buildout over two phases. <br /> A. Existing (2019) Conditions Analysis <br /> Analysis of Existing (2019) conditions found that all signalized study intersections operated at <br />
The URL can be used to link to this page
Your browser does not support the video tag.