My WebLink
|
Help
|
About
|
Sign Out
Home
Waikoloa Lutheran Church Use Permit Application Packet_FINAL (4_12.14.2023)_v1
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
Waikoloa Lutheran Church Use Permit Application Packet_FINAL (4_12.14.2023)_v1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 8:53:03 PM
Creation date
3/14/2024 8:34:55 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/15/2023
Permit Number
PL-USE-2023-000018
Parcel Number
680020560000
Description
Waikoloa Lutheran Church Use Permit Application Packet_FINAL (4_12.14.2023)_v1 - OLD - Application Package
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for administrative offices, classrooms for church services and educational purposes, <br /> storage for cleaning supplies, a cry room for congregation members and a kitchen to <br /> support congregation gatherings and potlucks. <br /> The proposed church facility is shown in the architectural plans as prepared by Fins <br /> Architecture, LLC (see Architectural Plans). The proposed structure is within the <br /> property's 25'-0" front and back setback and 15'-0" side yard setback. The proposed <br /> parking area is situated north of the proposed structure. There will be no off-site <br /> parking. In accordance with the zoning code, <br /> This civil improvements propose 43 regular sized parking stalls which includes 2 <br /> handicap/ADA compliant stalls and loading aisles (see Civil Plans). The parking lot <br /> improvements shall be constructed entirely in phase 1. <br /> The church complex will include natural and native landscaping harmonious with the <br /> surrounding area. The church complex will have multiple pedestrian ingress/egress <br /> and a single vehicular roadway connecting to Paniolo Avenue. <br /> C. Timetable and Cost <br /> The Applicant hopes to finalize its plans following the issuance of the Use Permit and <br /> plans to begin construction of this approximately at the end of this year for the new <br /> complex project as soon as possible. The first phase will commence in 2024 and be <br /> concluded by 2024 or early 2025 with a build out timetable of 12-15 months. The <br /> second phase is planned to be commenced in 3-5 years and will take approximately 12 <br /> months to complete. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.