My WebLink
|
Help
|
About
|
Sign Out
Home
USE PERMIT 99 (92_001)_v1
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
USE PERMIT 99 (92_001)_v1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 9:13:30 PM
Creation date
3/14/2024 9:11:08 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
10/4/2016
Related Permits
680020560000
Permit Number
PL-USE-2024-000024
Parcel Number
680020310000
Description
USE PERMIT 99 (92_001)_v1- PL-Other supporting documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Paul Bleck <br /> Page 3 <br /> The inability of the applicant to comply with the requirements of Condition No. 4 <br /> and Condition No. 5 of Use Permit No. 99 is the result of conditions which could not <br /> have been foreseen or are beyond the control of the applicant. Delays in constructing the <br /> project were due to a change in staff at the Waikoloa Baptist Church, which has caused <br /> delays in organizing the project and with the follow-up. Additionally, funding has not <br /> been available to build all the components in the time frame originally set. To date the <br /> applicant has spent over$260,000 on the construction of the project, all of which as been <br /> donated. These events could not have been foreseen and are not the result of their fault or <br /> negligence. <br /> The applicant is requesting time extensions for Condition No. 4 and Condition <br /> No. 5 to obtain Final Plan Approval and to commence and complete construction of the <br /> remainder of the development. The approval of the amendment requests will allow the <br /> applicant to complete the remainder of the development in a timely manner. <br /> Based on the above, it is recommended that the request for amendment to Condition <br /> No. 4 and Condition No. 5 be approved. <br /> Approval of this amendment is subject to the following conditions (new material is underscored <br /> and deleted material is bracketed): <br /> l. The petitioner, its successors or assigns shall be responsible for complying with <br /> all conditions of approval. <br /> 2. Final Plan Approval for Phase I and related improvements shall be secured from <br /> the Planning Department within one year from the effective date of this permit. <br /> To assure adequate time for plan approval review in accordance with Chapter [2-5- <br /> 244]25-2-72 (Zoning Code), plans shall be submitted a minimum of forty-five <br /> days prior to the date by which plan approval must be secured. Detailed <br /> landscaping, parking, and interior traffic circulation patterns shall be included on <br /> plans submitted. <br /> 3. Construction of Phase I shall commence (building permit) within one year from <br /> the date of receipt for Final Plan Approval and shall be completed within two <br /> years thereafter(certificate of occupancy). <br /> 4. Final Plan Approval for [Phmse-H]the remainder of the development and related <br /> improvements shall be secured.from the Planning Department within two (2) <br /> years from the [date ^^mplet e ..fR, ase r] effective date of this amendment. <br /> To assure adequate time for plan approval review and in accordance with Chapter <br /> [2-5�]25-2-72 (Zoning Code),plans shall be submitted a minimum of forty-five <br /> days prior to the date by which plan approval must be secured. Detailed <br />
The URL can be used to link to this page
Your browser does not support the video tag.