My WebLink
|
Help
|
About
|
Sign Out
Home
COR-17-109840(PLA)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
6-8-002:031
>
COR-17-109840(PLA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2019 9:44:07 PM
Creation date
2/10/2017 2:56:02 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
2/10/2017
Permit Number
COR-17-109840
Parcel Number
680020310000
Description
680020310000, APPLICATION FOR PLAN APPROVAL, AUTHORIZATION LETTER, TAX CLEARANCE, DRAINAGE REPORT, SITE PLANS, WAIKOLOA BAPTIST CHURCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> • <br /> Belt Collins Hawaii <br /> PROJECT: Waikoba Baptist Church JOB NO: 2016.33.2400 <br /> CLIENT: FHG Architects AIA,LLC DATE: 3-Nov-16 <br /> BELT , SUBJECT: Drainage Computations BY: tho <br /> ` FILE: M:\Waikoloa Baptist Church12016332400\05 Basis of Design\Reports\Drainage-for Plan ApprovaNDR-wbc for pa.xls)Q <br /> Table 2:Weighed runoff coefficient <br /> EXISTING/ CHECK(HIDE) <br /> BUILDING PAVEMENT DISTURBED LANDSCAPED Drain TOTAL AREA <br /> AREA AREA AREA AREA Area A WEIGHTED <br /> sq ft sq ft sq ft sq ft Sq ft acres C <br /> CONDITION C=1.00 C=0.9 C=0.32 C=0.25 <br /> 1 0.9 0.32 0.25 <br /> (1) (2) (3) (4) (5) (6) <br /> Existing 0 0 539,316 0 539,316 12.38 0.32 <br /> Proposed 39,198 132,160 264,490 103,468 _ 539,316 12.38 0.50 <br /> Legend: <br /> (1): area name(as shown on plans) <br /> (5): Total Area=sum of columns(1)to(4) <br /> (5): c= Weighted runoff coefficient <br /> NOTE: As the increase in rainfall runoff from prior improvements were addressed when the improvements were constructed,the prior <br /> improvement areas were considered to be existing area for both the existing and proposed conditions in the above table. <br /> Appendix B <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.