My WebLink
|
Help
|
About
|
Sign Out
Home
COR-13-085808DOHPPM
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
6-8-002:031
>
SUB-13-001251 FSA
>
COR-13-085808DOHPPM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2019 2:18:59 PM
Creation date
6/17/2013 8:59:17 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/14/2013
Related Permits
SUB-13-001251
Permit Number
COR-13-085808
Parcel Number
680020310000
Description
HEALTH COMMENTS, PPM, WAIKOLOA BAPTIST CHURCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BJ Leithead Todd <br />June 14, 2013 <br />Page 2 of 4 <br />2. In accordance with HAR, Sections 11-55-04 and 11-55-34.05, the Director of <br />Health may require the submittal of an individual permit application or a Notice <br />of Intent (NOI) for general permit coverage authorized under the National <br />Pollutant Discharge Elimination System (NPDES). <br />a. An application for an NPDES individual permit is to be submitted at least <br />180 days before the commencement of the respective activities. The <br />NPDES application forms may also be picked up at our office or <br />downloaded from our website at: <br />http://www.hawaii. gov/health/environmental/water/cleanwater/forms/indi <br />v -index _html _ <br />b. An NOI to be covered by an NPDES general permit is to be submitted at <br />least 30 days before the commencement of the respective activity. A <br />separate NOI is needed for coverage under each NPDES general permit. <br />The NOI forms may be picked up at our office or downloaded from our <br />website at: <br />http://www.hawaii.gov/health/environmental/water/cleanwater/fonns/ enl <br />-index.html. <br />i. Storm water associated with industrial activities, as defined in Title <br />40, Code of Federal Regulations, Sections 122.26(b)(14)(i) through <br />122.26(b)(14)(ix) and 122.26(b)(14)(xi). [HAR, Chapter 11-55, <br />Appendix B] <br />ii. Construction activities, including clearing, grading, and <br />excavation, that result in the disturbance of equal to or greater than <br />one (1) acre of total land area. The total land area includes a <br />contiguous area where multiple separate and distinct construction <br />activities may be taking place at different times on different <br />schedules under a larger common plan of development or sale. An <br />NPDES permit is required before the commencement of the <br />construction activities. [HAR, Chapter 11-55, Appendix C] <br />iii. Discharges of treated effluent from leaking underground storage <br />tank remedial activities. [HAR, Chapter 11-55, Appendix D] <br />iv. Discharges of once through cooling water less than one (1) million <br />gallons per day. [HAR, Chapter 11-55, Appendix E] <br />V. Discharges of hydrotesting water. [HAR, Chapter 11-55, <br />Appendix F] <br />vi. Discharges of construction dewatering effluent. [HAR, Chapter <br />11-55, Appendix G] <br />vii. Discharges of treated effluent from petroleum bulk stations and <br />terminals. [HAR, Chapter 11-55, Appendix H] <br />
The URL can be used to link to this page
Your browser does not support the video tag.