My WebLink
|
Help
|
About
|
Sign Out
Home
COR-14-092330DOHREVPPM
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
6-8-002:031
>
SUB-13-001251 FSA
>
COR-14-092330DOHREVPPM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2019 4:06:27 PM
Creation date
6/17/2014 4:19:20 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/12/2014
Related Permits
SUB-13-001251
Permit Number
COR-14-092330
Parcel Number
680020310000
Description
SUB-13-001251, DOH COMMENTS, REVISED PPM, WAIKOLOA BAPTIST CHURCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Duane Kanuha <br /> June 12, 2014 <br /> Page 2 of 3 <br /> a. An application for an NPDES individual permit is to be submitted at least <br /> 180 days before the commencement of the respective activities. The <br /> NPDES application forms may also be picked up at our office or <br /> downloaded from our website at: <br /> http://www.hawaii.gov/health/environmental/water/cleanwater/forms/indi <br /> v-index.html. <br /> b. An NOI to be covered by an NPDES general permit is to be submitted at <br /> least 30 days before the commencement of the respective activity. A <br /> separate NOI is needed for coverage under each NPDES general permit. <br /> The NOI forms may be picked up at our office or downloaded from our <br /> website at: <br /> http://www.hawaii.gov/health/environmental/water/cleanwater/forms/genl <br /> -index.html. <br /> i. Storm water associated with industrial activities, as defined in Title <br /> 40, Code of Federal Regulations, Sections 122.26(b)(14)(i) through <br /> 122.26(b)(14)(ix) and 122.26(b)(14)(xi). [HAR, Chapter 11-55, <br /> Appendix B] <br /> ii. Construction activities, including clearing, grading, and <br /> excavation, that result in the disturbance of equal to or greater than <br /> one (1) acre of total land area. The total land area includes a <br /> contiguous area where multiple separate and distinct construction <br /> activities may be taking place at different times on different <br /> schedules under a larger common plan of development or sale. An <br /> NPDES permit is required before the commencement of the <br /> construction activities. [HAR, Chapter 11-55, Appendix C] <br /> iii. Discharges of treated effluent from leaking underground storage <br /> tank remedial activities. [HAR, Chapter 11-55, Appendix D] <br /> iv. Discharges of once through cooling water less than one (1) million <br /> gallons per day. [HAR, Chapter 11-55, Appendix E] <br /> v. Discharges of hydrotesting water. [HAR, Chapter 11-55, <br /> Appendix F] <br /> vi. Discharges of construction dewatering effluent. [HAR, Chapter <br /> 11-55, Appendix G] <br /> vii. Discharges of treated effluent from petroleum bulk stations and <br /> terminals. [HAR, Chapter 11-55, Appendix H] <br /> viii. Discharges of treated effluent from well drilling activities. [HAR, <br /> Chapter 11-55, Appendix I] <br /> ix. Discharges of treated effluent from recycled water distribution <br /> systems. [HAR, Chapter 11-55, Appendix J] <br />
The URL can be used to link to this page
Your browser does not support the video tag.