My WebLink
|
Help
|
About
|
Sign Out
Home
2022-12 BR-019-2(077)_Nanue_PreliminaryPlans
>
Planning Department
>
Cultural Resources Commission
>
Materials
>
2024
>
2024-06-12
>
NANUE STREAM BRIDGE REHABILITATION (PL-CRC-2024-000017)
>
2022-12 BR-019-2(077)_Nanue_PreliminaryPlans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 8:27:34 AM
Creation date
5/16/2024 8:25:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: �HAwAI HAw BR-019-2(077) 2024 3 184 <br /> I. The scope of work for this project includes installing underwater 10. No material or equipment shall be stockpiled or otherwise stored <br /> concrete below the foundation furthest on the Makai side of Bent 8; within highway right-of-way except at locations shown on the plans <br /> installation of BMP measures;hazardous material countermeasures; or designated in writing and approved by the Engineer. <br /> and traffic control. <br /> 11. The Contractor shall restore any damaged benchmarks or survey <br /> 2. Subsection 105.16(A)-Subcontract Requirements requires the monuments. This work shall be considered incidental to the various <br /> Contractor to perform work amounting to not less than 30 percent contract items. <br /> of the total contract cost less deductible items. <br /> 12. Benchmark for this topo <br /> 3. The Contractor's attention is directed to the following Sections of <br /> the Standard Specifications and the Special Provisions: Subsection 13. The Contractor shall maintain invasive species controls to ensure <br /> 104.09-Maintenance of Traffic;Subsection 105.09-Coordination that all materials transported to the site is free of such species. <br /> Between the Contractors;Subsection 107.06-Contractor Duty <br /> Regarding Public Convenience;Subsection 107.12-Protection of <br /> Persons and Property;and Section 645-Work Zone Traffic Control. 14. All project related materials and equipment placed in the water <br /> shall be free of pollutants. <br /> 4. At the end of each day's work,the Contractor shall remove all <br /> equipment and other obstructions to permit free and safe passage <br /> of public traffic. <br /> 5. The existence and location of underground utilities,manholes, <br /> monuments and structures as shown on the plans are from the <br /> latest available data but the accuracy is not guaranteed. The <br /> encountering of other obstacles during the course of work is <br /> possible. The Contractor shall tone for the exact locations and <br /> depths of all underground facilities,either shown on or omitted <br /> from the plans. Toning shall be considered incidental to the various <br /> contract items and will not be paid for separately. The Contractor <br /> shall be held liable for any damages incurred to the existing <br /> facilities and/or improvements as a result of his operations. <br /> 6. The Contractor shall notify Hawaii Island Hele-On Bus two(2) <br /> weeks prior to lane closures,informing them of the location and <br /> dates of lane closures and name of affected roadway. <br /> 7. The Contractor shall notify the Engineer in writing,two(2)weeks <br /> prior to starting construction operations. <br /> 8. The Contractor shall indemnify and be solely responsible for the <br /> protection of adjacent properties,utilities,and existing structures <br /> from damages due to construction.Repairing any damage shall be at <br /> the Contractor's own expense,to the satisfaction of the Engineer. <br /> 9. The existing drainage system shall be kept functional at all times <br /> during construction. Furnish materials,equipment,labor,tools and DEPARTMENTATIoN <br /> �° <br /> incidentals necessary to maintain flow. This work shall be HH.^vs°�.�s'°" <br /> 0 E 0 t considered incidental to the various contract items. RAL NSP�T <br /> s a l a F GENERAL NOTES <br /> a7 $ HAWAII BELT ROAD <br /> i` Nanue Stream Bridge Rehabilitation <br /> Federal Aid Project No.BR-019-2(077) <br /> Scale:None Date:Mar.2024 <br /> SHEET No. N-1 OF 3 SHEETS <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.