Laserfiche WebLink
IO oHAWA�o HAwE S <br /> BR-019-2!077) 2024 115 HEETS <br /> Upstream Downstream A10.4 SA10.4 <br /> Hilo Honoka'a <br /> 3'6" <br /> Remove Upper Portion of ¢Bride <br /> g l'-0 3/4" I'-0 3/4" <br /> Exist.Anchor Bolts 2" _ <br /> 'ph_ a <br /> b Demolish and Remove III <br /> Upper Portion of Conc. �, Remove Upper Portion of <br /> ® Pedestal ,II/ ro' Exist.Anchor Bolts <br /> 0 0 exist. l 7/8"dia. o <br /> Y_v \_. anchor bolts `n N <br /> A A :14 AroundSawcut 1"Deep I� a o exist. l 5/8"dia. <br /> Around Entire ", N anchor bolts <br /> M II Perimeter I ,o <br /> 1 1■■g■■ <br /> ME= <br /> �F � <br /> 111111 iii A <br /> MIME <br /> 8,9A <br /> 6I-0„ -• 8,98 8,9C 1 exist."4 c/.stirr. l'-6" ti< 1'-6" <br /> exist.161"6 vert. c 18"oc <br /> 6'6" <br /> 6'-6" <br /> k 6,-0„ l0'-0" <br /> 10'-0" �I 12'-0" <br /> BENT NOS. 8 AND 9 FOUNDATION - DEMOLITION ELEVATION( A 1 DEMOLITION SECTION A <br /> Scale, 1/4"_/'-0" <br /> sA10:4AAo.4 Scale, 1/4"=I'-0" SAM 15,9.4 <br /> LEGEND <br /> STATE OF likWAII <br /> V1� Demolish and Remove NOTES, DEPARTMENT AVON <br /> MENT of TRANSPORT <br /> HIGHWAYS DWISION <br /> 1:-. o Demolish and Remove with 1. The Contractor shall not damage,demolish,or remove any FOUNDATION DEMOLITION <br /> _g_ € ',. No Larger Than a 60-Lb existing reinforcing steel or anchor bolts,unless explicitly ELEVATIONS AND SECTIONS <br /> Pneumatic Demolition Hammer shown. <br /> HAWAII BELT ROAD <br /> Demolish and Remove with No 2. If reinforcing steel is encountered within the demolition limits Nanue Stream Bridge Rehabilitation <br /> Larger Than a 30-Lb and is not shown on the contract drawings,inform the Federal Aid Project Na BR-019-2!0771 <br /> Pneumatic Demolition Hammer Engineer immediately. Scale,As Noted Date,Mar.2024 <br /> SHEET No.SAi0.4 OF 14 SHEETS <br /> 115 <br />