My WebLink
|
Help
|
About
|
Sign Out
Home
PD Background Report (PL-SLU-2022-008 & PL-REZ-2022-039)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-06-20 Leeward
>
Item #1 Kaupulehu Land LLC (PL-SLU-2022-000008)
>
PD Background Report (PL-SLU-2022-008 & PL-REZ-2022-039)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 9:13:20 AM
Creation date
6/12/2024 9:42:26 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
2/2/2023
Related Permits
PL-SLU-2022-000008
Permit Number
PL-REZ-2022-000039
Parcel Number
640240270000
Description
PD Background Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
setback easement along its entire Mamalahoa Highway frontage. Since the highway <br /> fronting the property was transferred to the State in 2021, the Department of <br /> Transportation has the authority to determine whether and where access to the property <br /> will be permitted, if at all. The existing dwellings on the subject site are currently <br /> accessed by Ishihara Farm Road, a private road over an approximately 50-foot-wide <br /> combined easement within Lots 11-A-2 and 11-A-3 in favor of the subject property (Lot <br /> 11-A-1). The subject property was allowed the ability to utilize non-exclusive access <br /> easements over and across Easements "5" and"6" and a non-exclusive utility easement <br /> over and across Easement"9", as granted by the Declaration of Easements dated May 11, <br /> 2005. The new residential lots will similarly be accessed by Ishihara Farm Road and by <br /> interior access easements. The applicant is proposing two new access points from <br /> Mamalahoa Highway to service the three proposed commercial lots, driveways that will <br /> connect to an internal roadway providing access to parking. The commercial properties <br /> will not have vehicular access via Ishihara Farm Road. <br /> 24. Traffic: A Traffic Impact Analysis Report(TIAR)was completed in September 2022 by <br /> The Traffic Management Consultant(TMC) (see Exhibit 6 of application). The TIAR <br /> was designed to study current conditions of peak hour traffic data, evaluate traffic count <br /> data to establish existing traffic conditions, develop trip generation characteristics, <br /> analyze traffic impact on Mamalahoa Highway from two proposed access driveways, <br /> Ishihara Farm Road and at adjacent intersections in the project area (Waikelehua Place, <br /> Keaka Kea Place and Earl's Pa`auilo Store Driveway) and to recommend ways to <br /> mitigate impacts identified in the study. The analysis of existing traffic conditions found <br /> that all the studied intersections operated at an acceptable Level of Service (LOS) <br /> between LOS "A" and LOS "C". The TIAR assumes full build out and occupancy of the <br /> project by 2027, at which time it is expected to generate net totals of 37 vehicle trips per <br /> hour(vph) and 63 vph, during the AM and PM peak hours of traffic, respectively. The <br /> net PM peak hour trips generated by the proposed project are expected to exceed the 50 <br /> vehicles per hour trip generation threshold established by concurrency requirements of <br /> the Zoning Code for roadway mitigation. In 2027, the LOS is expected to degrade at most <br /> of the intersections, but will still be no worse than LOS "D." Based on the findings, the <br /> TIAR recommends the following traffic mitigation measures: 1) The median taper on the <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.