Laserfiche WebLink
The applicant anticipates approximately 38 cars for Sunday services based on <br /> available parking, 10 to 15 vehicular trips for Tuesday services and 5 vehicle trips on <br /> Wednesday evenings. These events are not expected to cause a significant or long-term <br /> increase in traffic, as they will occur outside of peak traffic hours. <br /> According to the HOVE Road Maintenance Corporation, parking is prohibited on <br /> private roads in HOVE, and all parking shall be situated on the subject property. A <br /> condition of approval will address this requirement. <br /> It is not anticipated that the church use will have any visual impact as the proposed <br /> facility and related infrastructure will be consistent with the rural residential character of <br /> the surrounding community. <br /> Based on the preceding it is not anticipated that the proposed use will adversely <br /> affect the surrounding properties. <br /> (C) Such use shall not unreasonably burden public agencies to provide <br /> roads and streets, sewers,water, drainage, school improvements, and police and fire <br /> protection. Access to the subject parcel will be provided by a single gravel driveway from <br /> Ginger Blossom Lane, a privately owned and maintained roadway with approximately 20 <br /> feet of pavement within a 40-foot right-of-way. The applicant proposes to install a 38-stall, <br /> gravel parking area including 4 ADA compliant parking stalls. <br /> County water is not available to the subject property. The applicant proposes to <br /> install a 10,000-gallon catchment tank to serve non-potable and fire suppression water <br /> needs and will install a separate,4,000-gallon closed water tank to for potable water needs. <br /> According to the applicant, water will be trucked in to ensure sufficient potable and non- <br /> potable water needs. A condition of approval will require the applicant to comply with Fire <br /> Code requirements for sufficient fire suppression water. <br /> There is no county sewer system in the area. The applicant proposes to utilize <br /> portable toilets for wastewater generated by use of the temporary tent structure and to <br /> construct a new individual wastewater system in conjunction with the permanent church <br /> structure. Based on staff consultation with the Department of Public Works, Building <br /> Division, construction of permanent bathroom facilities will be required pursuant to the <br /> Building and Plumbing Codes as part of the building permit for the permanent facility. The <br /> -5- <br />