My WebLink
|
Help
|
About
|
Sign Out
Home
POWERPOINT PRESENTATION PL-CCI-2024-000007
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-07-01 Windward
>
Item #2 County Council Initiated - Bill 134 (PL-CCI-2024-000007)
>
Additional Info given at WPC 07-01-24 Hearing
>
POWERPOINT PRESENTATION PL-CCI-2024-000007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2024 12:26:54 PM
Creation date
6/30/2024 12:26:35 PM
Metadata
Fields
Template:
Plan Doc Template
Description
POWERPOINT PRESENTATION
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGAGEMENT (CONT.) <br /> 4 Mr.tendo Kern.Director <br /> page 2 <br /> DEPARTMENT OF WATER SUPPLY•COUNTY OF HAWAII April 13.2022 <br /> 3.45 KEKUANAO'A STREET,SUITE 20•HILO.HAWAI'l 96720 <br /> TELEPHONE 1808)961-8050•FAX 1808)961.8657 <br /> CRHD11'S: <br /> April 11.2u_2 Credit of 37 towards the total prevailing FC. <br /> 00H PLANNING DEPT which is subject to change.for drilling,casing.and <br /> APR 1117072*IX 27 outlining a production well Ilmrugh KSA H (556 378.751 <br /> PC of 2$writs ru$1.01.00.unit(previously paid) (515.000.00) <br /> RECD HAND DELWERED TWaI WCD pail to date for 25 units. <br /> uKcm, <br /> Director 23 Payments rd$150.001unit (486.250,001 1$187.628.751 <br /> TO: Mr.7clnd <br /> Manning o Kern. eat Total FC Balance 50.00 <br /> This is due and payable upon completion of the installation of the required water system <br /> FROM: Keith K.(Aumoo.Manager Chief Engineer improvements and piiorto final aubdivisionrdevv:lopmcnt approval being granted. <br /> Subject: Slate Land Gee Boundary Amendment(PL-SLU-2022-000001) A final dctcrminmionef the facilities charge balance will be made when water,%stem <br /> Ralurm-Agricultural to Prima improvements are satisfactorily completed or the project is handed. At this time.the NC <br /> Change of'Lone Application(PL-REG2022-000019) balance owed will be due oral payable pfior to fowl appnrval being granted. Additional <br /> Regont-Agricultural-1 Acre(Ada)to Single-Family Residentual-10.11110 facilities charges tray be applied in the event that the facilities charge rate is increased. <br /> Square feet(RS-10) For your information.water cxxnmiuncn[deposits arc credited towards the final facilities <br /> Applicant-Amy Ilatten-C'owdl Trust charge mquirrmcnl far the development. Note tRa the amoral of water crmmilmvnt deposit <br /> Tov\lap Key M-1-009!004 my exceed the prevailing facilities charge amour;lot example,when regU�sts lir time <br /> We have received the subject application and have the IOHowmg.comments and conditions. esicnxivns continuc and arc approved Until the developnkin is finally completed,tlkx are <br /> separate aril unrelated items. In the event that water commitmcm deposits exceed the facilities <br /> Please he informed That a time extension for a eommilment of 10.000 gallons per day at an aterage of charge.no refunds an applicable, <br /> 400 gallons per day.per unit.or 25 additional units of water.has been granted until June 30.2022. 4. Submit the appropriate documents,properly prepared and executed,to convey the water system <br /> Please keep in mind that the prompt pa-vmcni of the annual commitment of 5150.00 per unit.due by improvements mal necessary ca_scmcnis to the Water Board of the County of I lawai'i prior to <br /> the 30i"ofAme.each,year•will be the responsibility of the applicant, The Department assumes no final whdivision approval being$ranlesl. A registered land surveyor shall stamp and certify Uu <br /> responsibility in notifying applicants of the upcoming drtdline, rants and bourldsdescription within the conveyame documents. IluwcveT,prior to wa[er <br /> meter services being granted to the development or any lots within.the conveyance documents <br /> Tbe water commitment is subject to the following conditions: shall be accepted by the Water Board. <br /> I. Submit a schedule for completion of the proprsscd detrlopmcnl and utilit.nion of the watct 5. Comply with all other applicabk policies and rcquircmulls of flee IkTwnment's Rules and <br /> commitment units. Regulations. Noncompliance may be cause for voiding[his wafer commitment,at which time <br /> availability will be subject to change in accordance with prevailing water syaem condition, <br /> 2. Construe[necessary water system improvements. Submit installation plans pn'pond by a policies.and Rules and Regulations. <br /> prate sional engineer.registered in flu Stale of I lawai'i,for review and approval. Should there be auy,quesliom please contact l roy Samum of our Wager Resources and <br /> 3. Remi[the prehailing facilities charge(IT)bularnce.which is subject toclumge.as follows: Planning Ilianch at(808)961.8070.exkntsion 253. <br /> FACILITIES CHARGE Sincerely your.(FC)! "' <br /> 25 units ra.$6,(W5LQiunil $152.375.00 <br /> Total FC 5152.37500 <br /> Keith K A)Umnw.p.P.. <br /> ylanager{Chief]irngincer <br /> I'SAfg <br /> Planning Dept, <br /> �Exhibif_5 ..'Water;the?dost rPrrcious�sourcc...7(p'Wai A 7(�rte... copy-Amy I lager-C'owrll Tru[ <br /> m.n.r.+—or.— <br /> ipr s an EyW OoraY^6 pgMa�aria�per�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.