My WebLink
|
Help
|
About
|
Sign Out
Home
2024-03-04 Letter AOAO of Colony 1 at Sea Mountain, Anthony Gand (PL-CCH-2024-022)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-09-05 Windward
>
Item #1 AOAO of Colony 1 at Sea Mountain (PL-CCH-2024-022)
>
2024-03-04 Letter AOAO of Colony 1 at Sea Mountain, Anthony Gand (PL-CCH-2024-022)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2024 10:00:40 AM
Creation date
8/21/2024 8:53:38 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/4/2024
Related Permits
PL-SMA-2023-000046
Other Parcel Numbers
950190150000, 950190240000, 950190260000, 950190300000, 950190310000, 950190330000, 950190350000, 960010010003, 960010010003, 960010060000, 960010110013, 960020080000, 960020370000, 960020380000,
Permit Number
PL-CCH-2024-000022
Parcel Number
950190110000
Description
Letter acknowledge receipt of petition
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PWS RESPONSE: COLONY ONE AOAO — REQUEST FOR INFORMATION <br /> 6. Has PWS investigated the leaks in the water storage tank along with their specific cause(s) and <br /> repair needs? <br /> • A visual check for leaks of the water storage tank has been performed. To perform a <br /> thorough inspection, the reservoir will need to be taken off-line. <br /> 7. Has PWS developed a repair or replacement plan for the fire hydrants and determined if adequate <br /> supply and flow rates are available for each hydrant? Have inoperative or damaged hydrants been <br /> clearly marked as such and the Fire Department notified? <br /> • Yes, PWS is in the process of repairing and/or replacing the fire hydrants and marking <br /> them. <br /> 8. Has PWS developed a plan to repair or replace critical parts at the wastewater pumping station? <br /> • The replacement and repair plan of the wastewater pump station's needed parts is in place <br /> now. <br /> • Most recently a new submersible pump has been installed in the wet well of the wastewater <br /> pump station. The station's transformer has been repaired and checked by HELCO. <br /> • A comprehensive plan will follow with the Phase I infrastructure development upgrade. <br /> 9. Has PWS performed a lost wastewater audit on the wastewater system? <br /> • A comprehensive audit of the wastewater system will be performed at the Phase I <br /> infrastructure development upgrade. <br /> 10. Has PWS (or a contractor) surveyed and assessed the wastewater treatment plant for reliability <br /> and effectiveness? <br /> • Yes, a contractor has surveyed and assessed the wastewater treatment plant for reliability <br /> and effectiveness. <br /> 11. Has PWS identified and addressed all areas of concern outlined by the reports on both systems <br /> generated by Aqua Engineers and submitted to the PUC? <br /> • PWS has identified and is addressing all areas of the concerns outlined in the PUC report <br /> submitted by Aqua Engineers. <br /> 12. Is PWS currently in compliance with all State and Federal testing requirements? <br /> • PWS is in compliance with all State and Federal testing requirements. <br /> • The AOAO and all homeowners get a Consumer Confidence Report for drinking water <br /> analysis that meets Federal regulations. <br /> 2 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.