|
E. Resumes of Key Personnel Proposed for this Contract
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTR 14. YEARS EXPERIENCE
<br /> Taylor Chock Biologist/Environmental Planner& Project a.Total b.With Current Firm
<br /> Manager 11 2
<br /> 15. FIRM NAME AND LOCATION(CITY AND STATE)
<br /> Haley&Aldrich,Inc., Honolulu, HI
<br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Hawaii Lead Inspector(No. PB-0993); Hawaii Asbestos Inspector
<br /> MA, Ecology and Evolutionary Biology(EBIO) (No. HIASB-4478); PADI Open Water SCUBA
<br /> BA, Biology with Honors, Minors in Chemistry and Economics Certification; State of Hawaii Boating License; USACE Wetland
<br /> Delineation Certification (Cert. No. 9267; 2023)
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,TRAINING,AWARDS,ETC.)
<br /> Qualifications:Taylor is a biologist and natural resources professional. Her experience includes environmental assessment and
<br /> impact statements,environmental permitting,and feasibility studies for various federal,state and county projects throughout the
<br /> Pacific Rim. Taylor recently obtained her 38-hour Army Corps of Engineers Wetland Delineation Training Certificate.
<br /> RCLC VAIN I VNUJCL,IJ
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Waipi`o Valley Road Short Term Safety Improvements Professional Services Construction(If Applicable)
<br /> Island of Hawaii, HI 2023 2023
<br /> a -'of -- ( d Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Project biologist and environmental planner for rockfall and hazards mitigation evaluation for the Waipi`o Valley Road project for
<br /> the County of Hawaii.Taylor prepared the Biological Assessment,State Conservation District Use Permit,County Grading Permit,
<br /> and interfaced with SHPD and the Archaeologist.
<br /> (1)Title and Location(City and State)
<br /> Four Mile Creek Bridge Improvements(Bridge#22-7) Professional Services Construction(If Applicable)
<br /> Island of Hawaii, HI Ongoing
<br /> b (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Project biologist and Lead Environmental Planner supporting CONSOR Engineers, LLC and the County of Hawaii for geotechnical
<br /> aspects of design build bridge replacement. Provided permitting support for design and construction of new bridge foundations
<br /> and associated site improvements.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Geotechnical&Environmental Planning/Permitting Support,Restoration Professional Services Construction(If Applicable)
<br /> of Stream Crossings, Lihu'e-Koloa Forest Reserve,Kaua'i, HI Ongoing
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Rola ®Check If Project Performed With Current Firm
<br /> Project Biologist for restoration of stream crossings on the Lihu'e-Koloa Forest Reserve Roadway,owned by Department of Land
<br /> and Natural Resources.The roadway and stream crossings were severely damaged from significant storms on Kauai between
<br /> 2018 and 2020. Haley&Aldrich is providing natural resource,environmental planning,and geotechnical services for the design of
<br /> new stream crossings.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Hanalei National Wildlife Refuge River Intake Repair and NEPA Professional Services Professional Services
<br /> Permitting, Kauai, HI Ongoing N/A
<br /> d (31 Brief Descrin,-, Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Project Biologist for the preparation of NEPA and environmental planning compliance studies and documents related to
<br /> evaluation of alternative surface water intake structure locations and designs within the Hanalei National Wildlife Refuge.The
<br /> work is necessitated by the destruction of irrigation water distribution systems on the refuge by a severe storm in 2018.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Central Oahu Food Hub Environmental Compliance Support Professional Services Construction(If Applicable)
<br /> Wahiawa, HI Ongoing
<br /> e (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Staff environmental scientist providing hazardous materials sampling and reporting services for redevelopment of a commercial
<br /> agricultural development. Project includes development of a sampling plan based on available information,coordinating drilling and
<br /> sampling,data analyses,reporting,and development of a Construction Environmental Hazard Management Plan.
<br /> STANDARD FORM 330(REV.8/2016)
<br /> ALDRICH
<br />
|