|
E. Resumes of Key Personnel Proposed for this Contract
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Dave Buscheck,PE Senior Geotechnical Construction a.Total b.With Current Firm
<br /> Manager/GIS 31 19
<br /> 15. FIRM NAME AND LOCATION(CITY AND STATE)
<br /> Haley&Aldrich,Inc., Hawaii Island, HI
<br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> BS,Civil Engineering Professional Engineer—HI,CA
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,TRAINING,AWARDS,ETC.)
<br /> Qualifications: Dave is a registered civil engineer and former general engineering contractor with 30+years of expertise in the
<br /> design and construction of geotechnical stabilization systems. His recent experience includes serving as the construction manager
<br /> for several multi-million-dollar creek stabilization and restoration construction projects for Zone 7 Water Agency and Valley
<br /> Water. Dave excels at providing specialized GIS and geotechnical engineering skills paired with extensive knowledge and client
<br /> services for innovative,cost-effective solutions.
<br /> 19. RELEVANT PROJECTS
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Waipi`o Valley Road Short Term Safety Improvements Professional Services Construction(If Applicable)
<br /> Island of Hawai'i, HI 2023 2023
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> a Construction inspector for rockfall and hazards mitigation construction for the Waipi`o Valley Road project for County of
<br /> Hawaii. Haley&Aldrich's design included evaluation of conditions,conceptual recommendations for short-term and long-
<br /> term mitigation measures,and design of hazard mitigation measures. During the construction phase,we provided daily
<br /> construction monitoring, public outreach and facilitation,and consultation regarding sensitive species during construction.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> DHHL Papakolea-Kalawahine Professional Services Construction(If Applicable)
<br /> O'ahu, HI Ongoing N/A
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> b Haley&Aldrich is providing geotechnical engineering and LiDAR scanning services for the Papakolea-Kalawahine subdivision
<br /> on O'ahu.The subdivision consists of 87 residential parcels completed in 1998 for the Department of Hawaiian Home Lands.
<br /> Through the acquisition of a comprehensive level of geotechnical and precise geospatial site data,the purpose of the project
<br /> is to develop a qualitative and quantitative understanding of the nature,extent,and probable cause(s)for distress observed
<br /> at multiple properties and structures. Mr. Buscheck is serving as a lead engineer for the monitoring program.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Channel Wide LiDAR Monitoring Professional Services Construction(If Applicable)
<br /> Tri Valley,CA Ongoing N/A
<br /> 'ration(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> c Providing LiDAR scans of the entire 37 miles of flood control channels for the Zone 7 Water Agency.These services are being
<br /> provided in wake of above-normal rainfall over the 2022-2023 winter when the Agency experienced over one hundred
<br /> channel bank failures.The data will be used to supplement other ongoing studies for Zone 7 involving channel bank condition
<br /> assessment,soils testing,failure analyses,and predictive modeling to assist the Agency in developing enhanced flood control
<br /> management.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Bolsa Road Fish Passage Professional Services Construction(If Applicable)
<br /> Gilroy,CA Ongoing N/A
<br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm
<br /> Senior Construction Manager for Santa Clara Valley Water District on the rehabilitation of approximately 1700 lineal feet of
<br /> d Uvas Channel adjacent to the Christopher Ranch facility,to restore fish passage through the area. Construction involves the
<br /> installation of ramps in and out of the channel,demolition, removal,and disposal of existing concrete rubble,abandoned
<br /> automobiles,and other unsuitable material.The project will be completed with a revegetation plan consisting of willow pole
<br /> cuttings,container plants, hydroseeding,and erosion control measures. CE&G is utilizing advanced measurement systems
<br /> (UAS and LiDAR)for pre-construction, in-progress,and post-construction (as-built)3D imaging for monitoring work progress
<br /> and for claims management. CE&G will also be providing construction vibration monitoring throughout the work.
<br /> STANDARD FORM 330(REV.8/2016)
<br /> ALDRICH
<br />
|