My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-30 PL-INT-2024-008117 Haley and Aldrich Category PL.2
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.02 - Botany
>
2024-06-30 PL-INT-2024-008117 Haley and Aldrich Category PL.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 1:37:37 PM
Creation date
7/10/2024 3:15:35 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2024
Permit Number
PL-INT-2024-008117
Description
Haley and Aldrich, Professional services for category PL.2, PL.5, PL.10, PL.13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Example Projects Which Best Illustrated Proposed <br /> Team's Qualifications for This Contract <br /> (Present as many projects as requested by the agency,or 10 projects if not specified.Complete one Section F for each project) <br /> 20.EXAMPLE PROJECT 21.TITLE AND LOCATION(CITY AND STATE) 22.YEAR COMPLETED <br /> KEY NUMBER <br /> 4 Geotechnical and Environmental Planning/Permitting Professional Services Construction(if applicable) <br /> Support,Hanalei National Wildlife Refuge River Intake 2022 2022 <br /> Repair, Kauai, HI <br /> 23.PROJECT OWNERS INFORMATION <br /> a.Project Owner b.Point of Contact Name c.Point of Contact Telephone Number <br /> U.S.Fish and Wildlife Service KPFF, Mark Wharry, PE 503.524.3860 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(INCLUDE SCOPE,SIZE,AND COST) <br /> Project Cost: Start/Completion Dates: Client Quote or Other Relevant Data: <br /> $357K(Haley&Aldrich Fees) 2020/Ongoing <br /> Haley&Aldrich provided geotechnical engineering and environmental consulting services for KPFF,the prime consultant providing <br /> preliminary engineering services for the US Fish and Wildlife Service(USFWS)at their Hanalei National Wildlife Refuge(NWR). USFWS <br /> utilizes a water intake on the Hanalei River to regulate water levels in the NWR,which consists of approximately 75 acres of wetland <br /> impoundments, 180 acres of taro patches,and 90 acres of wet pasture.The NWR is home to five endangered water birds. <br /> Scouring was evident at the intake location and river morphology <br /> may have been altered by recent heavy rain and flooding events. tro <br /> , • ��{'' <br /> The USFWS requested a study to: s % • �� �,P " ' <br /> » Document the existing site conditions of the refuges earthen <br /> levee and main irrigation intake water control infrastructure f ' <br /> (WCS). <br /> » Present construction repair options to the intake and levee. r � -} <br /> p p - <br /> » Provide an engineering estimate of probable cost estimate for <br /> the identified repair options including relocation of the existing ti?'°W <br /> WCS either upstream or downstream of the existing site. <br /> Haley&Aldrich's tasks included: <br /> » Review of existing information and previous reports that may have information regarding intake. <br /> » Geotechnical inspection of the intake structure, including hand-auger borings in the levee. <br /> » Biological surveys,wetland delineation,and determination of the Ordinary High-Water Mark at the project site. <br /> » Evaluation of environmental and cultural clearances and permits likely to be required for the project, including discussing with <br /> KPFF potential design options and permits likely to be triggered by different options. <br /> » Preparation of a geotechnical memorandum based on results of our field visit and data review, providing our recommendations <br /> for embankment restoration and hardening. <br /> » Preparation of project permit applications and requests for approval, including Clean Water Act Section 404 consultation,Stream <br /> Channel Alteration Permit, NEPA CATEX documentation, Endangered Species Act Section 7 consultation; and National Historic <br /> Preservation Act Section 106 consultation. <br /> Haley&Aldrich provided construction support to the project by conducting inspections of the foundation system and testing, <br /> providing training on endangered species concerns,and reviewing and contractor's compliance with environmental requirements. <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)Firm Name (2)Firm Location(City and State) (3)Role <br /> Haley&Aldrich, Inc. Honolulu, HI Subconsultant: Geotechnical <br /> a Engineering, Environmental Permitting <br /> and Consulting <br /> STANDARD FORM 330(REV.8/2016) <br /> HREBNICH <br />
The URL can be used to link to this page
Your browser does not support the video tag.