|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> A.TOTAL B.WITH CURRENT FIRM
<br /> Carah Kadota,AICP Assistant Planning Project Manager 8 1
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> (Bowers+Kubota Consulting,Waipahu,HI
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> Bachelor of Environmental Design
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> American Planning Association,Hawaii Chapter American Institute of Certified Planners(Certificate No.34599)
<br /> • . ►TPC• T ! �®
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Kahawainui Stream Dredging Ongoing N/A
<br /> Laie,HI
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Planner
<br /> SCOPE:Processing permit applications with approvals including DA permit,401WQC,NPDES permit for construction
<br /> stormwater discharges,stream channel alteration,HRS Ch. 6E with SHPD.
<br /> PROJECT COST: $2,000,000
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Vulnerable Road User Safety Assessment(VRUSA)
<br /> Statewide HI Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Planner
<br /> bSCOPE: Working with the HDOT to develop the State's first Vulnerable Road User Safety Assessment(VRUSA). A VRUSA is
<br /> an assessment of the safety performance of a State with respect to vulnerable road users and the plan for the State to improve
<br /> the safety of vulnerable road users.Addressing the safety of vulnerable road users through a collaborative and comprehensive
<br /> approach allows people that walk,bike,and roll full and safe access to our transportation system.The assessment will include
<br /> the Safe System Approach,which aims to improve safety culture,increase collaboration across all stakeholders,and refocus
<br /> transportation system design and operation on anticipating human mistakes and lessening impact forces to reduce crash
<br /> severity and save lives.
<br /> PROJECT COST: 575,000
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Highways Route 50(Kaumualii Highway)Feasibility Study,Hanapepe to
<br /> Kekaha Ongoing N/A
<br /> Kauai,HI
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> c. ROLE:Planner
<br /> SCOPE:B+K will conduct a Feasibility Study to explore conceptual details,constraints,and prospective timelines for different
<br /> resiliency improvement alternatives based on probable future scenarios of concern for Route 50,Kaumualii Highway,from
<br /> Hanapepe to Kekaha. The scope of work will include coastal modeling of tidal flood frequency analysis and high-resolution
<br /> sea level rise and wave inundation modeling.The modeling will be conducted for a variety of future sea level rise scenarios
<br /> combined with different wave events to help estimate the frequency of occurrence of flooding at selected intervals in the future.
<br /> PROJECT COST:N/A
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation,Harbors PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Consulting Engineer's Report for FY2017-2019
<br /> Statewide,HI 2021 N/A
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Planner
<br /> SCOPE:Preparation of a Consulting Engineer's Report that examined the operations of all commercial harbors and associated
<br /> improvements within fiscal year 2017-2019.
<br /> PROJECT COST: $50,000
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation,Harbors PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Department of Transportation,Harbors
<br /> Pier 40 Improvements Honolulu Harbor
<br /> Honolulu,HI Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> e. ROLE:Planner
<br /> SCOPE:State Department of Transportation,Harbors is proposing improvements to Piers 39 and 40 that's used by
<br /> Young Brothers as an interisland terminal. The project would fill the harbor area between Piers 39 and 40 and demolish certain
<br /> areas of these piers to offset fill and loss of U.S. Waters. Inland areas would be raised 3 feet to address sea level rise and
<br /> redevelopment of Young Brothers facilities. An EIS would be prepared along with addressing several federal requirements to
<br /> support a U.S.COE Individual Permit for pier work.PROJECT COST: $1,413,000
<br /> STANDARD FORM 330(7/2021)Page 6
<br />
|