E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.) (y Z-11 r t
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Michael J. Foley, Ph.D., PE Senior Civil and Coastal Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 18 18
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> Ph.D. Civil Engineering, 2015 Professional Engineer,
<br /> M.S. Civil and Environmental Engineering, 2011 Civil Engineering Class,
<br /> B.A. Environmental Science: Concentration in Physics, 2006 State of Hawai'i (PE-17342)
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Dr. Foley is a Civil, Ocean and Environmental Engineer with years of experience in engineering analysis and design services as well
<br /> as environmental assessment and monitoring projects. His specialties include hydraulic and hydrologic analysis and design, coastal
<br /> engineering and environmental planning and permitting.
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pahonu Beach and Shoreline Restoration PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Waimanalo, Hawai'i Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> a. Project Manager. In the first phase,temporary shoreline erosion controls were designed and installed to address
<br /> imminent risks of coastal hazards along multiple properties. Next, an engineering assessment was completed to
<br /> explore long-term options. In the later phase, coastal data was collected and a numerical model of the beach
<br /> dynamics was developed.A plan for beach nourishment and stabilization was proposed. Design fee: $300,000
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kahana Regional Beach Erosion Mitigation PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Lahaina, Hawai'i 2017
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> b. Principle Investigator. Approximately%mile of shoreline developed with nine condominium complexes is
<br /> exposed to severe shoreline hazards due to beach and shoreline erosion. Dr. Foley lead the design of a shoreline
<br /> restoration project, assessment of multiple design alternatives, preparation of an environmental impact
<br /> statement, and community outreach.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kauai Kailani, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kapa'a, Hawai'i 2016 2023
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Principle Investigator. A temporary shoreline structure was designed to help mitigate an imminent erosion
<br /> c.
<br /> hazard risk. As a long term solution, a plan to nourish the beach and construct a stabilization structure was
<br /> developed. A dredging plan was also drafted to recover beach quality sand from a nearby drainage system. After
<br /> receiving all the necessary environmental clearances and land disposition,the project was constructed. Beach
<br /> monitoring was installed using cameras and software to track the project success.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Portlock Road Drainage Outfall Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Hawai'i 2015 2021
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Project Engineer. An existing nearshore breakwater protecting the outlet of an existing at municipal stormwater
<br /> d' drainage outfall was damaged. Dr. Foley design a replacement coastal structure to mitigate wave energy,
<br /> sediment transport and drainage issues at the shoreline.The project involved evaluation of coastal dynamics,
<br /> innovative structure design, environmental permits, land use entitlements, construction plans, specifications,
<br /> cost estimate, and post design services.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Keopu-Hienaloli Streams Flood Control Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kona, Hawai'i 2013
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑� Check if project performed with current firm
<br /> e. Project Engineer. Conducted a hydrological analysis of the watershed area including eight flood levels (2-year, 5-
<br /> year, 10-year, 25-year, 50-year, 100-year, 200-year and 500-year storms). Identified and assessed existing flood
<br /> control and drainagefacilities within the project area. Developed a hydraulic design analysis for a proposed flood
<br /> reduction plan.
<br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1
<br />
|