Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) (y Z-11 r t <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Michael J. Foley, Ph.D., PE Senior Civil and Coastal Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 18 18 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> Ph.D. Civil Engineering, 2015 Professional Engineer, <br /> M.S. Civil and Environmental Engineering, 2011 Civil Engineering Class, <br /> B.A. Environmental Science: Concentration in Physics, 2006 State of Hawai'i (PE-17342) <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Dr. Foley is a Civil, Ocean and Environmental Engineer with years of experience in engineering analysis and design services as well <br /> as environmental assessment and monitoring projects. His specialties include hydraulic and hydrologic analysis and design, coastal <br /> engineering and environmental planning and permitting. <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pahonu Beach and Shoreline Restoration PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Waimanalo, Hawai'i Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> a. Project Manager. In the first phase,temporary shoreline erosion controls were designed and installed to address <br /> imminent risks of coastal hazards along multiple properties. Next, an engineering assessment was completed to <br /> explore long-term options. In the later phase, coastal data was collected and a numerical model of the beach <br /> dynamics was developed.A plan for beach nourishment and stabilization was proposed. Design fee: $300,000 <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kahana Regional Beach Erosion Mitigation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Lahaina, Hawai'i 2017 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> b. Principle Investigator. Approximately%mile of shoreline developed with nine condominium complexes is <br /> exposed to severe shoreline hazards due to beach and shoreline erosion. Dr. Foley lead the design of a shoreline <br /> restoration project, assessment of multiple design alternatives, preparation of an environmental impact <br /> statement, and community outreach. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kauai Kailani, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kapa'a, Hawai'i 2016 2023 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Principle Investigator. A temporary shoreline structure was designed to help mitigate an imminent erosion <br /> c. <br /> hazard risk. As a long term solution, a plan to nourish the beach and construct a stabilization structure was <br /> developed. A dredging plan was also drafted to recover beach quality sand from a nearby drainage system. After <br /> receiving all the necessary environmental clearances and land disposition,the project was constructed. Beach <br /> monitoring was installed using cameras and software to track the project success. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Portlock Road Drainage Outfall Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Hawai'i 2015 2021 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Engineer. An existing nearshore breakwater protecting the outlet of an existing at municipal stormwater <br /> d' drainage outfall was damaged. Dr. Foley design a replacement coastal structure to mitigate wave energy, <br /> sediment transport and drainage issues at the shoreline.The project involved evaluation of coastal dynamics, <br /> innovative structure design, environmental permits, land use entitlements, construction plans, specifications, <br /> cost estimate, and post design services. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Keopu-Hienaloli Streams Flood Control Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kona, Hawai'i 2013 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑� Check if project performed with current firm <br /> e. Project Engineer. Conducted a hydrological analysis of the watershed area including eight flood levels (2-year, 5- <br /> year, 10-year, 25-year, 50-year, 100-year, 200-year and 500-year storms). Identified and assessed existing flood <br /> control and drainagefacilities within the project area. Developed a hydraulic design analysis for a proposed flood <br /> reduction plan. <br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />