Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) (y Z-11 r t <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Vicki Spradlin Construction Inspector/Drafting a.TOTAL b.WITH CURRENT FIRM <br /> Technician 17 4 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> Bachelor of Science, 1994 <br /> Mechanical Engineering Technology,ABET-accredited <br /> Industrial Supervision Minor <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 30 HOUR OSHA CERTIFICATION <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Construction Management Services for Mangrove Removal and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Eradication at Keehi Lagoon, Daniel K. Inouye International Airport 2020-2021 2021 <br /> Honolulu, HI <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Engineer. In response to FAA wildlife regulations on bird habitats, the project removes large mangrove <br /> a. patches on islands located in the DOT Airport's Ke'ehi Lagoon. Position works closely with DOT Airport personnel <br /> and construction contractor to provide comprehensive support services and overall construction management. <br /> Daily transport by boat to jobsite for inspections and work observation. Provide detailed written reports and <br /> digital photographs to document progress. Conduct meetings. Confirm safety and work quality assurances. <br /> Coordination of homeless outreach with DOT personnel. Manage submittals, proposals, change orders, invoices, <br /> etc. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Construction Management Services for Phase 1 of the OST ACM & PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Air Conditioning Modifications at the Daniel K. Inouye International ongoing <br /> Airport-Honolulu, HI <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Engineer. Overall construction management services and on-site DOTA representative for pre- <br /> b. construction, construction, and post-construction phases. Initial project constructability review. Initial planning <br /> and coordination.Work with construction contractor, subconsultants and SMEs. Perform daily inspection, work <br /> observation, and reporting. Conduct meetings with owner. Confirm safety and quality assurances. Manage <br /> project budget and billings. Manage submittal responses, RFI5,field orders, <br /> change orders, work outages, issues, and disputes. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Free Electron Laser(FEL) Facility Development PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> The University of Hawai'i Physics and Astronomy Dept., Honolulu, HI 2004-2008 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Consultant/Designer. Facility development under a $50 million federal grant for defense-related research. <br /> Produced multitudes of complex machine designs and drawings (2D & solid models). Special project <br /> c. <br /> contributions included laser transport system design, radiation protection system planning, and cleanroom <br /> design-build. Vetting and selecting specialty vendors across the U.S. to fabricate over 300 machined and micro- <br /> machined components. Wrote technical summaries, coordinated high dollar purchases, established a <br /> procurement process to adhere to federal grant guidelines. Quality checks on received system components. <br /> Presentations to key stakeholders. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lucent Technologies Telcom Infrastructure Installations, Nationwide PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Lucent Technologies is now Nokia. Client was AT&T. 1996-2002 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Network Systems Engineer/Project Manager- Managed the life cycle of projects with durations varying from <br /> d. three months to two years,with value up to $4 million. Project scopes included engineering, materials, and <br /> installations for local exchange services, 5E switches, and leased space arrangements. Discipline areas included <br /> building network infrastructure, network equipment, power supplies/cabling and transmission cabling. Also <br /> worked with sales, engineering, and installation teams to develop winning <br /> proposals, budgets, and schedules. <br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />