Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) (y Z-11 r t <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Catherine Hanna, EIT Civil Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 10 4 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Oceanit Laboratories, Inc., Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MS Civil and Environmental Engineering/2012 Engineer in Training, New York, No. 088183 <br /> BS Civil Engineering/2011 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certifications: OSHA 10-Hour Training#36-005323436(2015), OSHA Asbestos Awareness Training#1360(2021), AHA Heartsaver <br /> First Aid CPR&AED (2021) <br /> Awards: Charles Lee Crandall Award Winner(2010 &2011), Margaret Arronet Corbin Award Winner(2011), Intel Foundation <br /> Research Grant Recipient(2011) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Water Infiltration into Basement of International Arrivals Building PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, O'ahu, Hawai'i Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> a. Project Engineer. Prepared book specifications for and provided detailing of improvements intended to stop <br /> water infiltration into the north and south portions of the Daniel K. Inouye International Airport basement. <br /> Researched specialty products and collaborated with manufacturers, distributors and local contractors to <br /> determine product suitability. Coordinated details with structural engineering consultant, SLSH. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State Irrigation System Reservoir Safety Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Waimea, Big Island, Hawai'i Ongoing <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Engineer. Civil design and detailing of 40 linear feet of subgrade outlet pipe extension, new concrete <br /> intake box at the base, and new valve and valve stem system along the slope of Pu'ukapu Reservoir. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kahana Bay Erosion Mitigation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Lahaina, Maui, Hawai'i Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> C. Project Engineer. Prepared conceptual plans and details using Civil 3D for the four(4) alternatives considered in <br /> the project's Environmental Impact Statement (EIS), intended to develop a sustainable and resilient approach to <br /> mitigate regional erosion along 3,700 linear feet of Kahana shoreline. Developed quantity take-offs for each <br /> alternative for cost estimating purposes. Contributed to preparation of written content for EIS publication. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Mantokuji Mission Shoreline Adaption PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Pa'ia, Maui, Hawai'i Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Engineer. Prepared specifications and RFP package for an emergency temporary protection structure, <br /> d. consisting of imported, beach-compatible sand wrapped in geotextile fabric, along 112 linear feet of shoreline <br /> fronting the historic temple structure. Coordinated permitting efforts with regulatory agencies, and provided <br /> construction administration, including reviewing submittals and responding to RFI5. Prepared preliminary plans <br /> and design for the restoration of the sandy beach in Mantokuji Bay, as a permanent solution to the erosion and <br /> consequent threat to the temple,to help facilitate discussions with the community and regulatory agencies. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Ko'a Kea Resort Shoreline Protection PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Koloa, Kaua'i, Hawai'i Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Engineer. Performed site reconnaissance, involving a site visit and local shoreline recession data <br /> collection. Prepared an engineering assessment of the beach and shoreline erosion at the property, assessed <br /> e. <br /> adaption options considering cost, constructability, and permitting implications, and developed conceptual plans <br /> and details for 165 linear feet of restored beach fronting the resort to reduce risks to public safety and natural <br /> resources from shoreline recession. Also developed conceptual plan for comprehensive small-scale beach <br /> restoration spanning seven (7) properties along 1,600 linear feet of Kiahuna Beach to incite collaborative <br /> discussions between owners. <br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />