Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) (y Z-11 r t <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Dayananda H.Vithanage, PhD, PE Principal,QA/QC a.TOTAL b.WITH CURRENT FIRM <br /> 55 34 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS, Civil Engineering Civil Engineer, Hawai'i <br /> MS, Coastal Engineering <br /> PhD, Ocean Engineering <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Dr. Vithanage is responsible for overseeing the technical quality of each project. He reviews project deliverables for quality <br /> assurance and quality control (QA/QC). He is involved with all stages of projects at Oceanit. He has served as the principal <br /> investigator for many coastal, civil, environmental,watershed, and environmental remediation projects throughout the state. <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Honouliuli Wastewater Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 'Ewa Beach, Hawai'i 2012 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Principal-in-charge for investigating the feasibility and environmental impacts of extending the existing outfall to <br /> a. obtain a National Pollutant Discharge Elimination System (NPDES) permit for future wastewater disposal from <br /> the treatment plant for the City and County of Honolulu. Installed two water column monitoring data buoys at <br /> the two depths and analyzed data for one year to evaluate the impacts on the water column. Conducted dye <br /> studies to model far field dispersion and plume fate. Developed conceptual outfall extension designs. Near real- <br /> time data and results were posted to an extranet website.The approximate project cost was$680,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> 'Aliomanu Road Coastal Erosion Control PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Anahola, Hawai'i 2013 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Principal-in-charge for the design of an emergency erosion control and protection solution for'Aliomanu Road <br /> b. using coconut fiber sandbags for the County of Kaua'i. Conducted topographic and beach surveys, designed a <br /> permanent shore protection solution, and prepared an environmental assessment and plans, specifications, and <br /> cost estimates (PS&Es). Submitted applications for all required federal, state, and county permits for approval. <br /> The design included a revetment and the rebuilding of the road and shoulder.The approximate project cost was <br /> $197,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Ala Wai Canal Watershed Flood Mitigation and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Ecosystem Restoration Project, O'ahu, Hawai'i 2013 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Principal-in-charge for the development of designs for flood alleviation in Waikiki and restoration of ecosystems <br /> in the upper watershed that includes Palolo, Manoa, and Makiki streams. Oceanit helped develop the project <br /> c. scope conceptual designs to mitigate intensity of flooding in Waikiki and restoring the functionality of the <br /> streams that provide habitat and migration path for endemic fish. Numerous informational meetings with State <br /> and County agencies, stakeholders, environmental groups, and the general public were held to discuss the <br /> stream problems, their impacts, and proposed restoration measures. Oceanit completed a hydrographic survey <br /> for Ala Wai Canal and part of the Ala Wai Boat Harbor. A hydrologic and hydraulic analysis was also completed <br /> for the watershed. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Water Infiltration in the Basement of the International Arrivals Building PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Daniel K. Inouye International Airport(HNL), O'ahu, Hawai'i Phase 1: July 2019 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Principal-In-Charge for investigation and preliminary design of a complete solution to stop water infiltration in <br /> the basement of the International Arrivals Building(IAB) at HNL.The basement has been afflicted by continuous <br /> d <br /> ' water infiltration (average 40 gallons per minute) and flooding events for the past two decades; a chronic <br /> problem that renders some areas unusable and impedes access to mechanical equipment and storage. After <br /> reviewing as-built plans, the Oceanit team investigated water infiltration sources into the basement,tested <br /> chemical composition of the infiltrating water and developed conceptual designs to prevent the infiltration and <br /> provided a report of the findings and recommendations. Phase 1 cost: $550,000. <br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />