My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-25 PL-INT-2024-008058 Sea Engineering, Inc. Category PL.4
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
2024-06-25 PL-INT-2024-008058 Sea Engineering, Inc. Category PL.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 2:53:25 PM
Creation date
7/10/2024 2:47:41 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/25/2024
Permit Number
PL-INT-2024-008058
Description
Sea Engineering, Inc. Professional services for category PL.4, PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 1 <br /> agency,or 10 projects,if not specified. Complete one Section F for each project.) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> Hilo Harbor Breakwater Improvements—Basis of Design PROFESSIONAL SERVICES CONSTRUCTION <br /> Hilo,Hawaii 2024 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> U.S. Army Corps of <br /> Ben Berridge—Cardno GS 808-476-0067 <br /> Engineers <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> The Hilo Harbor breakwater is an <br /> approximately two-mile-long <br /> rubble mound rock structure that <br /> protects inner Hilo Bay's port <br /> facilities from direct wave <br /> exposure. �. �� <br /> Recent inspections of the Hilo <br /> breakwater have found areas of <br /> possible damage, mostly limited to <br /> local areas along the structure. • <br /> Multiple visual inspections of the <br /> breakwater were conducted as part <br /> of the annual Project Condition Surveys (PCS), which were performed by a mix of USACE and Sea <br /> Engineering, Inc. (SE) inspection teams in 2015, 2016, 2017, 2018, 2020, and 2021. Observed <br /> irregularities were found to include displaced armor units, attrition of supportive core stone (hollowing <br /> out of core),structure slumping,and excessive settling. As a result of the inspections,repairs have been <br /> recommended in numerous locations <br /> 15618°W 15608°W15506.W <br /> 100.111 identified along the breakwater and vary in <br /> is" <br /> s size from very localized to hundreds of feet <br /> in length. <br /> In support of the need for repairs to the <br /> breakwater, SE has been contracted by <br /> „ nr Cardno GS and the U.S. Army corps of <br /> Engineers to develop, analyze, organize <br /> and summarize all necessary design <br /> ' conditions, that will constitute an updated <br /> a w+ . <br /> Basis of Design(BoD). <br /> , • 4�s $ 5iY'i 7i ry n "° <br /> 4,40 <br /> 15506°W 16504.W <br /> This project won the 2023 ASCE OCEA Award for Best Studies and Research Project—Future Stability <br /> and Adaptation Under Sea Lever Rise at Hilo Breakwater. <br /> Cost: $381,189 <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> (City and State) <br /> Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.